39
XII - WATER TREATMENT & FREEZE PROTECTION
Recommended Aluminum Antifreeze
& Inhibitor Suppliers
Recommended Products
Interstate Chemical
2797 Freedland Road
P.O. Box 1600 Hermitage, PA 16148-0600
www.interstatechemical.com
Tel: 800-422-2436 Fax: 724-981-8383
Intercool NFP-30,40,50 AA
Intercool RPH-15*
Noble Company
PO Box 350 Grand Haven, MI 49417
www.noblecompany.com
Tel: 800-878-5788 Fax: 800-272-1519
Noburst AL Antifreeze
Rhomar Water Management, Inc.
PO Box 229 Springfield, MO 65801
www.rhomarwater.com
Tel: 800-543-5975 Fax: 417-862-6410
Rhogard Antifreeeze
Pro-Tek 922 Inhibitor*
* These products may be used to adjust the pH level of the hydronic system, but on occasion may not resolve the pH issue.
In these cases it is recommended to flush the system and refill with untreated water and new boiler manufacturer ap-
proved antifreeze suitable for Aluminum heat exchangers.
IMPORTANT
: Regardless of antifreeze or inhibitors used, be sure to follow the antifreeze manufacturer’s instructions for
use, safe handling and storage of their products. Refer to the MSDS (Material Safety Data Sheets) provided by the anti-
freeze manufacturer for potential hazards and first aid procedures for exposure or ingestion.
Antifreeze Testing Services:
Each of the recommended antifreeze manufacturers have developed a sampling program
available to the homeowner and contractor. Contact the antifreeze manufacturer regarding their sampling plan procedure.
Consult the antifreeze manufacturer for details on sample requirements and recommendations.
The boiler manufacturer reserves the right to make changes without notice.
Содержание UB90-100
Страница 15: ...15 Near Boiler Piping Figure 2 Single Zone Boiler Piping ...
Страница 16: ...16 Figure 3 Multi zone Boiler Piping With Zone Valves Near Boiler Piping ...
Страница 19: ...19 Figure 6 Diaphragm Type Expansion Tank Piping Near Boiler Piping ...
Страница 20: ...20 Figure 7 Conventional closed type Expansion Tank Piping Near Boiler Piping ...
Страница 27: ...27 Combustion Air and Vent Pipe Figure 11 Combustion Air and Vent Piping ...
Страница 32: ...32 Electrical Wiring Figure 13 Field Wiring Connections ...
Страница 53: ...53 DETAILED SEQUENCE OF OPERATION ...
Страница 57: ...57 TROUBLESHOOTING CHART 2 TROUBLESHOOTING ...
Страница 58: ...58 TROUBLESHOOTING CHART 3 TROUBLESHOOTING ...
Страница 60: ...60 TROUBLESHOOTING CHART 5 TROUBLESHOOTING ...
Страница 63: ...REPAIR PARTS Model No UB90 50 UB90 75 UB90 100 UB90 50 100 GAS FIRED DIRECT VENT CONDENSING HOT WATER Boiler ...
Страница 64: ...64 20 3 5 TYP OF 4 6 11 8 9 10 13 15 16 2 12 1 21 17 18 18 4 19 7 A Jacket and Base Assembly Repair Parts ...
Страница 72: ...P O Box 4729 Utica NY 13504 4729 ...