Fire System Monitoring Panels
Chubb Fire & Security Pty Ltd
Technical Manual
Page 18 of 22
3: Commissioning
A full commissioning test in accordance with AS5062-2006, Fire protection for Mobile and Transportable
Equipment, must be completed in order to ensure that the panel is installed correctly and is fully functional.
The outcomes of the test should be recorded as part of the fire suppression system commissioning report
and completion documentation provided to the customer.