4
10
. Measure in all direction as shown in figure.
Make the base bar assembly in a perfect square.
IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.
10a
. (Concrete foundation) Using a carpenter
square, line up corners. Align Base bars, mark the
concrete at the holes in the base and drill concrete
with 1/4” (dia. 6mm) concrete bit to accept anchor
bolts to a 1 3/4” (44mm) depth. Replace base and
secure with 1/4” x 1 3/8” (M6 x 35mm) anchor bolts
(not provided).
Concrete foundation
(367
mm)
9
. Place the entrance taper channel (ECA) on top
of the (BBF). Secure with (S2) screws to the
foundation. See fig. 1 & 2.
Fig.1
Fig.2
ECA
BBF
S2
1 & 2
(3037mm
)
(1) Sliding channel support left
(SSA)
(2) Sliding channel cover left/right
(SCA)
(4) Top slider
(TS)
(1) Door column profile left
(DCL)
(1) Door column profile right
(DCR)
(76) Sheet metal screw
(S1)
(8) Machine screw
(S3)
(64) Plastic washer
(PW)
Parts Needed:
(1) Wall panel front right
(WFR)
(1) Wall panel front left
(WFL)
(2) Wall panel corners left&right (WCFS)
(5) Wall panel side (WS)
(1) Sliding channel right
(SRA)
(1) Sliding channel left
(SLA)
(1) Top angle back left
(ABLA)
(1) Top angle back right
(ABRA)
(2) Top angle side left & right (AS1S)
B. Walls & Columns
All panels are clearly
marked and care should
be taken to use
the correct one.
Note
Note - Use screws with plastic washers
on top of prepainted surface only.
ECA
BBF
ECA
(367