background image

3

6

. Assemble base bar back left 

(BLB)

 and base 

bar back right 

(BRB

) with four 

(S1)

 screws.

See fig. 1 & 2.

7

. Place the base bar assembly on top of the 

foundation. Use 

(S2

) screws to fix the assembly to 

foundation.

Fig.1

Fig.2

BLB

BRB

S1

BLB

BRB

8

. Insert the base bar side 

(BSC)

 into 

(BLB)

 & 

(BRB)

 secure with two 

(S1)

 screws on both sides.

See blowup.

S2

Fig.1

Fig.2

Step 1

Step 2

BSC

BLB

BRB

BSC

S1

S1

BLB

BRB

Back

BSC

BSC

IMPORTANT: USE HAND GLOVES TO PREVENT INJURY.

Step 1

Step 2

1 & 2

1

2

1

Fig.1

Содержание DURAMAX Foundation Kit

Страница 1: ...ng or damaged parts Do not return to the store Customer Service Hotline 800 483 4674 www duramaxbp com TOOLS YOU WILL NEED Cordless Drill Philips Head Rubber mallet Hand Gloves Goggles Carpenters Square Level 3ft Foundation Kit Pent Roof Metal Garden Shed A L L P U R P O S E M E T A L S T O R A G E S H E D S ...

Страница 2: ...on FC1B FC2B FC3C FC1B FC3C FC2B U CHANNEL Note Check all parts prior to installation CODE DESCRIPTION FC1B FOUNDATION U CHANNEL 2 FC2B FOUNDATION U CHANNEL 2 FC3C FOUNDATION U CHANNEL 2 FC4C FOUNDATION U CHANNEL 4 FC5B FOUNDATION U CHANNEL 3 FCC FOUNDATION U CHANNEL 4 ACCESSORIES CODE DESCRIPTION QTY S2 DIA 4 2 x 16mm 5 32 x 5 8 SHEET METAL SCREW 48 Parts List S2 FRONT SIDE IMPORTANT USE HAND GLO...

Страница 3: ...channel FC4C into the main frame as shown See Fig Make sure while assembling the channel position should be as shown Note 5 Fix the channel FC5B into the frame with screws as shown See Fig FCC FCC FCC FCC FC4C FC4C FC4C FC4C FC5B FC5B FC5B IMPORTANT USE HAND GLOVES TO PREVENT INJURY S2 S2 S2 ...

Страница 4: ...f the foundation Use S2 screws to fix the assembly to foundation Fig 1 Fig 2 BLB BRB S1 BLB BRB 8 Insert the base bar side BSC into BLB BRB secure with two S1 screws on both sides See blowup S2 Fig 1 Fig 2 Step 1 Step 2 BSC BLB BRB BSC S1 S1 BLB BRB Back BSC BSC IMPORTANT USE HAND GLOVES TO PREVENT INJURY Step 1 Step 2 1 2 1 2 1 Fig 1 ...

Страница 5: ...ews 10 Place the base bar BBF on top of BSC on both sides Secure with S1 screw to BSC on both corners See fig 1 2 S2 BBF BSC Fig 1 Fig 2 BBF BSC S1 S2 BSC BSC BBF BBF IMPORTANT USE HAND GLOVES TO PREVENT INJURY Fig 1 Step 1 1 2 Step 2 Fig 2 Step 1 Step 2 1 2 1 2 ...

Страница 6: ...11 Secure the base BBF to the foundation with S2 screws 12 Place exterior grade CDX 3 4 19mm plywood inside the foundation See fig S2 BBF BBF IMPORTANT USE HAND GLOVES TO PREVENT INJURY Fig 1 1 1 OPTION 1 ...

Страница 7: ...r fill the concrete upto the foundation top surface IMPORTANT USE HAND GLOVES TO PREVENT INJURY 13 Place the entrance taper channel ECB on top of the BBF Secure with S2 screws to the foundation See fig 1 2 S2 Fig 1 Fig 2 ECB BBF Step 1 Step 2 OPTION 2 ...

Страница 8: ...U S Polymers Inc 1057 S Vail Ave Montebello CA 90640 United States of America RD 1 0 2015 07 07 SKU ...

Отзывы: