Page 24
Seed Series 16 & 20 Conveyor
Efficient and safe operation of the Seed Series Conveyor requires that each operator
reads and understands the operating procedures and all related safety
precautions outlined in this section. A pre-operation checklist is provided for the
operator. It is important for both the personal safety and maintaining the good
mechanical condition of the Conveyor that this checklist is followed.
Before operating the Conveyor and each time thereafter, the following areas should
be checked off:
1. Service the machine per the schedule outlined in Section F, Maintenance.
(Page 32)
2. Use only an electric motor of adequate power to operate the machine.
3. Check that all guards are installed, secured and functioning as intended. Do not
operate with missing or damaged shields.
4. Check worksite. Clean up working area to prevent slipping or tripping.
5. Check winch and cable for security and operation. There should be at least 3
complete wraps of cable around winch drum in full down position. Cable anchor
on winch drum must be tight. Inspect cable for fraying or damage and replace if
damaged or frayed.
6. Check that cable clamps are secure.
7. Check that drive belt and conveying belt are not frayed or damaged and that they
are properly adjusted and aligned.
8. Be sure Conveyor wheels are chocked.
9. Check that discharge and intake areas are free of obstructions.
Anchoring and / or support of Conveyor during operation is
necessary. When the lower half of Conveyor empties of material,
the weight balance transfers to the upper end of the machine,
which can cause upending.
PRE-OPERATION CHECKLIST
Содержание SEED 16 Series
Страница 13: ...Page 13 Seed Series 16 20 Conveyor Part 09 02 0011 Part 09 02 0006 Part 09 02 0007 ...
Страница 15: ...Page 15 Seed Series 16 20 Conveyor Part 09 02 0010 Part 09 02 0012 Part 09 02 0011 ...
Страница 21: ...Page 21 Seed Series 16 20 Conveyor INSTALLING WINCH and CABLE TYPICAL CABLE ROUTING ...
Страница 39: ...Page 39 Seed Series 16 20 Conveyor Mechanical Drawings Mechanical Drawings Section Section I I ...
Страница 46: ...Page 46 Seed Series 16 20 Conveyor SEED SERIES 16 FIXED CONVEYOR STAND 56 INCHES 05 05 0047 4 2 9 8 6 1 3 5 7 ...
Страница 48: ...Page 48 Seed Series 16 20 Conveyor SEED SERIES 16 FIXED CONVEYOR STAND ...
Страница 57: ...Page 57 Seed Series 16 20 Conveyor SEED SERIES 16 CONVEYOR UNDERCARRIAGE 45 FT A B C 7 8 2 1 9 23 11 12 ...
Страница 78: ...Page 78 Seed Series 16 20 Conveyor SEED SERIES 16 BASE CONVEYOR 25 FT 1 4 6 5 3 7 2 ...
Страница 82: ...Page 82 Seed Series 16 20 Conveyor SEED SERIES 16 BASE CONVEYOR 35 FT REV A 1 5 7 6 4 3 8 2 ...
Страница 88: ...Page 88 Seed Series 16 20 Conveyor SEED SERIES 20 FIXED CONVEYOR STAND 56 INCHES 4 1 9 8 6 2 3 5 ...
Страница 90: ...Page 90 Seed Series 16 20 Conveyor SEED SERIES 20 FIXED CONVEYOR STAND ...
Страница 122: ...Page 122 Seed Series 16 20 Conveyor NOTES ...