![US Water Systems Purely EZ Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/us-water-systems/purely-ez/purely-ez_installation-and-service-manual_1063824006.webp)
S
Scr
to
to
Im
me
ST
Fo
tan
fee
min
1/
3/
th
1/
ho
3/
3/
fa
ST
For
pol
tub
To
filt
val
pre
ope
unt
A
f
t
r
STEP 5: Mo
rew the filter
right in the o
the respectiv
mportant:
Re
embrane before
TEP 6: Tubin
r RO System
nk. A maximu
et. The fastest f
nimizing the le
/4" Tubing -
C
/8" Tubing -
C
he storage tank
/4" Tubing -
C
osebarb fitting
/8" Tubing
-
C
/8" Tubing -
C
aucet to drain c
TEP 7: Ice M
r adequate vo
lyethylene tub
bing as an obj
begin, install
ter and the fau
lve in the line
essure to incre
erate properly
til the tank is fu
Allow
the reserv
from the entire
this water to the
reaches optimu
Moun
ounting the
rs onto the m
order listed b
ve position l
emove the b
e screwin
g
in p
ng Connectio
s, determine
um distance f
flow at the fauc
ength of the tub
Connects the fe
Connects the
R
k.
Connects the m
g
on
air
g
ap fauc
Connects the p
Connects 3/8" h
connector.
aker Hook-U
olume and pre
bing is recom
jectionable ice
l a tee in the
ucet. Next, it i
to the ice mak
ease sufficientl
. Leave the ba
full after start u
D
voir to fill for 4
system and sen
e drain.
(May
ta
um quality).
nting
e Filters &
mounting head
below, matchi
abeled on th
lack protect
place.
on
the location
from tank to
cet can be achi
bing from tank
eed water valve
RO
membrane p
membrane drain
cet.
postfilter to the
hosebarb fitting
Up (Optiona
essure to all r
mmended.
Do
cube taste ca
white tubing
s recommende
ker. This will a
ly for the ice m
all valve in th
up procedure is
Do Not Use
4-6 hours. Dispe
nds it to the dra
ake up to
24
hou
the F
Membrane
d starting from
ing the filter
he mounting
ive cap from
for the storag
faucet is 15
ieved by
k to faucet.
e to the pre-filt
product port to
n port to
1/4"
faucet.
g
on
airgap
al)
refrigerators, 3
not use cop
an result.
between the f
ed to install a
allow storage t
maker solenoi
he closed posi
completed.
e the Firs
ense this water
ain. Repeat this
urs
of
runtime
[f
Filters
e
m left
label
head.
m the
ge
ter.
3/8”
pper
final
ball
tank
d to
ition
Fittin
John
To in
end sq
not pr
To in
firmly
the tub
STEP
Make
free fr
open.
Check
tubin
valve
enters
Open
until
This w
Close
the co
t Two Res
to drain. This p
process one mo
flushing]
at
start
s & Me
ngs and Tu
Guest
T M
fittin
sure an optim
quare. An ang
rovide an effici
nstall a tube,
y. To remove
be.
P 8: Activat
e sure all wate
rom leakage. S
k for leakage
g. Turn storag
(the handle
s the connection
the product w
all the air has
will take about
e the product
onnections for l
servoirs of
process remove
ore time.
Allow
up
or after a ne
embra
ubing
n
g
s are used
mal seal, tubin
gled cut or di
ient seal and m
push it throu
e a tube, push
ting System
er supply/dra
lowly turn the
e. If necessary
e tank valve on
should be in l
n).
water faucet a
s been expell
an hour for an
water faucet
leaks and corre
of Water.
es the factory in
w
the tank to fill
ew membrane r
ane
throughout t
ng should be
stortion of th
may cause leaks
ugh the collet
h in the colle
m for the Fi
ain lines are s
Feed valve un
y remove and
ne quarter turn
line with the tu
and let the wa
ed from the s
n RO system.
t. In 30 minut
ect if necessary
nstalled sanitiz
l for 4-6hours a
replacement, be
the system.
cut with the
e tubing will
s.
t until it seat
et and pull ou
rst Time
secure and
ntil fully
d recut the
to open the
ubing as it
ater flow
system.
tes, check
y.
zing solution
and dispense
efore system
ts
ut
Содержание Purely EZ
Страница 2: ......