2. HANDLING PROCEDURE

2.1 Assembly of Piping

Locatio n

(1) Mount the Pump on a clean, flat & level surface of sufficient rigidity. If it should installed outdoor, check

motor, V-Belt and other part are for outdoor service.

(2) There should be enough space for maintenance like disassembly, reassembly and periodical inspection,

etc.

Foundat ion

(1) The foundation concrete should have an adequate pressure bearing area, in consideration of the weight

of the pump and a withstanding pressure of the soil, because it could be subsided or inclined if the soil is
weak. The mix ratio of the concrete is 1-cement, 2-sand and 4-gravel.

(2) In order to embed anchor bolts in the concrete, the foundation must have holes of good size, and its

surface should be as even as possible.

(3) Upon confirmation that the concrete has been hardened, proceed with assembly of piping.

 Installati on

(1) Mount the pump horizontally and center it.
(2) Place the pump on the foundation, and support the base frame equally by inserting a choke liner between

the pump and the foundation surface so that the bed will be made horizontal and also a space for grouting
the cement mortar is obtained between the foundation surface and the bed.

(3) Put anchor blots in place on the bed preliminarily, set nuts on the full head of bolts, and leave them

pendulous in the bolt holes.
At this time, if the bed is supported locally, it could be deformed, notwithstanding its strength. Choke liners
stricken here and they will help support it properly.

(4) Assure the level by using a level meter: Check the levelness on the machined surface.

The levelness should be limited to 0.5mm in any one meter.

(5) Grout the cement mortar made up from 1-cement and 2-sand in the space under the bed and in anchor

bolt holes, and keep for few days. Upon hardening of the mortar, tighten the nuts for anchor bolts.
At this time, take care not to tighten them one sidedly.

2.2 Piping Work

Main  Piping

(1) Clean inside of suction and discharge pipe to be free from rust, dust and foreign matters, and place a

strainer of 40 mesh on or over suction side(All the pumps shipped from our shop are equipped with this
mesh filters at suction port).

(2) It is advisable to install expansion joint on the suction side as well as the discharge side of the pump.

Also, provide supports for piping so that no excessive load to be imposed on the pump.

(3) In case, Silencer is provided on discharge side, install it as near opening as possible.
(4) Be sure to install a Non-return Valve adjacent to the suction or discharge opening so that the pump will not

turn reversely. If installation of the Non-return Valve is a problem for service of the pump, install a gate
valve instead, and assure to shut off prior to stopping the pump.

(5) In case, the risk of condensate gas being collected on the pump discharge pipe, set a recovery tank under

the pump, and then the condensate gas and water will be collect during operation and be discharged by
opening of drain valve.

(6) Drain receiver should be installed under the drain valve to collect those discharged.

Содержание UDS Series

Страница 1: ...INSTRUCTION MANUAL FOR SCREW TYPE DRY VACUUM PUMP UDS Series U S VACUUM PUMPS LLC Rev Sep 2013...

Страница 2: ...ting with a wrong rotating direction could damage the pump 3 Never operate the pump with suction side open to air 4 Do not carry any maintenance while the pump is connected to the motor SAFETY INSTRUC...

Страница 3: ...ANDLING PROCEDURE 2 1 ASSEMBLY OF PIPING 8 2 2 PIPING WORK 8 2 3 LINKAGE 9 2 4 PREPARATION FOR OPERATION 9 2 5 OPERATION 9 2 6 STOPPING 10 2 7 LUBRICATION 10 3 MAINTENANCE AND INSPECTION 3 1 GENERAL 1...

Страница 4: ...e It has a perfect dynamic balance testing after the Screw is machined Timing Gear The timing gear is the most important part of the screw vacuum pump and it is necessary for turning the Screws with a...

Страница 5: ...40A 1 50A 2 65A 2 100A 4 Outlet Connection JIS ANSI 40A 1 40A 1 50A 2 65A 2 Cooling water Max Supply Pressure Barg 7 7 7 7 Pressure Drop Bar 1 0 1 0 1 0 1 0 Flow Rate Liter min 5 10 10 15 10 15 15 20...

Страница 6: ...r close main suction V V Dry run Cleaning purge This is to remove clean process gases condensed vapors from the pump which are build up inside the pump during the process These process materials build...

Страница 7: ...Choke liners stricken here and they will help support it properly 4 Assure the level by using a level meter Check the levelness on the machined surface The levelness should be limited to 0 5mm in any...

Страница 8: ...inside 4 Supply oil upto the red point of the oil gauge If oil runs short gear and bearing can seize and if oil is too much the temperature will rise excessively and can be cause of gear noise or som...

Страница 9: ...nated specifications 2 6 Stopping 1 Shut off suction side main V V 2 If any corrosive gas has been inhaled introduce the atmosphere from suction side for 20 30 minutes before stopping to clean inside...

Страница 10: ...y sound through stethoscope applied against the casing So make checks from time to time 4 In winter in cold regions whenever the pump is stopped let cooling water drained Freezing of water could damag...

Страница 11: ...Water contamination on Front End cover Clean or not 8 Oil Leak Oil not leaked 9 Lubricant Replacement All Oil Grease in Front end cover Grease cover to be replaced 10 Amount and pressure of Cooling Wa...

Страница 12: ...de of design parameters e g high temperature gases Troubles related to any modification done without approval of the vendor Troubles resulting from mis operation in the opinion of the vendor s service...

Страница 13: ...Replace the Screw and Casing Check the pressure difference between Inlet and Outlet Adjust improper Screw clearance Adjust Timing Gear Make the Side Clearance larger Make the clearance between Screw...

Страница 14: ...cuum level in full vacuum Is it normal Check Electric condition Voltage Amperage in full vacuum Is it acceptable Any abnormal noise Check operation temperature Is it normal Check lubricant color and l...

Страница 15: ...ber or by individual part number Unit each Model Description Quantity UDS 180 250 500 UDS 75 Only Lip 2 Lip Seal 4 4 Speedi sleeve 1 1 Mechanical seal 2 2 Oil seal 1 1 single ball bearing 1 1 Angular...

Страница 16: ...RIALIREMA RK SINOIDESCRIPTION 1 I ST D ICR99114 2 I STEEL 2 I STEEL SS400 SS400 SS400 SS400 SS400 DUCTILE ST D I 35x60 STEEL STEEL 2 DUCTILE 6 ITURCON QTI yIMATERIAL REfvtA RK S MATERIAL xrn I QUANTIT...

Отзывы: