MAINTENANCE
Leverage should be checked regularly by a compe-
tent person.
-Keep the chain lubricated and free of debris.
-Check brake operation.
-Before operation, checkthe following:
-Damage to the books.
-Damage to the chain ( stretched links, twisted
links, rusty links)
OPERATION
- Lifting: Select the UP position and operate the le-
ver to lift the load.
- Lowering: Select the LOWER position and operate
the lever to lower the load.
INTRODUCTION
This handbook provides important information for
staff involved in the installation, operation and
maintenance of this product. Even though you may
be familiar with this or other similar equipement, it
is recommended that you read this manual before
installation.
INFORMACIÓN
Capacities 0.75-1,5-3-6 Ton.
INSTRUCTIONS FOR USE
The equipemment must be operated and maintai-
ned by a competent person only.
-Not exceed the rated capacity of the rigging.
-Do not use the load chain as a sling.
-Do not extend the operating lever.
-Do not use undue force to operate the leverage.
-Do not leave the load suspended unattended.
-Do not use it to lift people.
-Make sure that the anchor points of the leverage
tackle are suitable for liftingthe load.
-No one should be underneath the loading area.
ESPECIFICACIONES TÉCNICAS
0.75
1.5
3
A
148 mm
172 mm
200 mm
B
90 mm
98 mm
115 mm
C
136 mm
160 mm
180 mm
D
40 mm
45 mm
58 mm
H
325 mm
380 mm
480 mm
L
280 mm
410 mm
410 mm
J
34 mm
38 mm
48 mm
POPA01
MAXIMUM HOOK OPENING
37 mm
CHAIN LENGHT
1.5 m
LEVER LENGHT
125 mm
LOAD CAPACITY
0.75 T
MAXIMUM LIFT
1.5 m
POPA02
MAXIMUM HOOK OPENING
45 mm
CHAIN LENGHT
1.5 m
LEVER LENGHT
160 mm
LOAD CAPACITY
1.5 T
MAXIMUM LIFT
1.5 m
POPA03
MAXIMUM HOOK OPENING
50 mm
CHAIN LENGHT
1.5 m
LEVER LENGHT
190 mm
LOAD CAPACITY
3 T
MAXIMUM LIFT
1.5 m
POPA04
MAXIMUM HOOK OPENING
64 mm
CHAIN LENGHT
3 m
LEVER LENGHT
220 mm
LOAD CAPACITY
6 T
MAXIMUM LIFT
1.5 m
3
E N G L I S H •
User's Manual