Outdoor Gym Maintenance and Inspection Checklist
All right reserved © Urbanix 2014
Outdoor Gym Maintenance Procedure
Whilst any maintenance is carried out the equipment must be secured against use
and the public warned of any risks associated with the work.
Consumable Components
Any parts replaced must comply with Urbanix specifications.
See assembly instructions for part numbers, part identification and method of
assembly.
1. Powder Coated Finish to Steel and Aluminum Components.
Periodically our products should be inspected for mechanical damage, and we
recommend that the powder-coated finish to steel components be cleaned with a
mild detergent solution and soft cloth. This should generally be carried out at least
once a year, unless the provision is within one mile of the sea in which case it should
be carried out every three months. Do not use strong solvents or solutions
containing chlorinated hydrocarbons, esters, ketones or abrasive cleaners or polish.
Particular attention should be paid to the areas adjacent to stainless steel
components where corrosion on bare steel would be accelerated.
Any breaks in coating surface identified should be made good within 28 days.
Any bare metal should be thoroughly abraded with 600-grade paper to remove any
corrosion, then applied with cold galvanic spray and recolored. Color spray is
available from Urbanix dealers.
2. Galvanized Steel Components.
Periodically all galvanized parts should be checked for signs of any damage that may
cause rusting. The parts should then be treated with a suitable cold galvanizing
application.
3. Bearings.
See installation instructions for replacement bearing parts and procedures.
4. Polyethylene mouldings.
As required, these may be cleaned with a suitable graffiti remover.
All Urbanix polyethylene mouldings are UV stabilised high density polyethylene to
provide a long trouble free life. However, after extended UV exposure some colour
fading and material embrittlement can be expected. This will vary depending on the
location and orientation of the mouldings, but after a period of 10 years all PE
moulded parts should be regularly checked for signs of embrittlement and replaced
as required.