background image

NOTICES DE MONTAGE

ASSEMBLY GUIDELINES

Содержание Proludic R37-UBX-224B

Страница 1: ...NOTICES DE MONTAGE ASSEMBLY GUIDELINES...

Страница 2: ...T I O N S 2 3 acier Inox Materiau Vis 2 Plaque signal tique 3 Pi ce Indication Liste pi ce 1 ABS support signal tique 1 1 3 Montage Fixer le support de signal tique en ABS 1 sur le poteau avec les vi...

Страница 3: ...0 1 8 9 10 11 12 UBX 400 16 UBX 400 17 UBX 400 18 UBX 400 19 UBX 400 20 UBX 400 21 UBX 400 22 UBX 400 23 UBX 400 24 UBX 400 25 UBX 400 32 2 3 4 8 7 6 5 9 10 11 12 Axe sup rieur Petit axe V rin V rin V...

Страница 4: ...kickbox Vis tremp e 13 13 14 15 14 15 16 19 18 17 16 17 18 19 UBX 400 33 UBX 400 34 UBX 400 35 UBX 400 36 UBX 400 37 UBX 400 38 UBX 400 39 Vis sup rieure kickbox Platine sup rieure kickbox Platine in...

Страница 5: ...e fixation Passer la cheville 3 au travers de la platine et de l embase 1 2 Positionner lesrondelles 4 et 5 sur l extr mit de la cheville 3 Serrer les 2 crous sur la vis et mettre le bouchon plastique...

Страница 6: ...elle caoutchouc 1 p 0RGH RSpUDWRLUH 1 Positionner la but e caoutchouc 3 sur la tige du v rin Mettre la rondelle 1 sur la but e 2 Positionner le support 2 puis dessus le couvercle 4 et verrouiller l en...

Страница 7: ...T N E S S S O L U T I O N S Concrete Volume 365 Litres Concrete Weight 875 KG Sol de s curit 200 240 cm Zone de d gagement 357 297 cm surface 6 80m surface 12 20m R37 UBX 224B 157 97 cm 157 97 300 412...

Страница 8: ...R F I T N E S S S O L U T I O N S Liste pi ces N Pi ce N Pi ce Materiau Qt 1 2 Poteau Poign e UBX 400 0 UBX 400 7 Acier Q235 Acier Q235 1 1 Commentaire il est recommander d effectuer un resserage des...

Страница 9: ...niveau de vandalisme la situation en bord de mer ou non la pollution de l air l ge de l appareil Si le contr le d tecte un risque sur des pi ces qui ne peuvent tre r par es ou chang es imm diatement...

Страница 10: ...tretien r gulier Fr quence mensuelle Il s agit principalement d inspection du fonctionnement r aliser selon un planning pr tabli une fois par mois Op ration OK Non Probleme Solution Rayures ou chocs s...

Страница 11: ...__ Maintenance occasionnelle Il s agit de t ches visant valider l int grit physique de l appareil ex cuter selon un planning pr tabli au moins une fois par an par du personnel qualifi et exp riment Ri...

Страница 12: ...ts en acier inoxydable ou la corrosion d acier mis nu serait acc l r e Toute rupture du traitement de surface doit tre trait e dans les 28 jours Si le m tal est nu poncer avec un papier abrasif grain...

Страница 13: ......

Страница 14: ...3 Steel Stainless steel Material Screw 2 Instruction sign 3 Part Name Indication Parts List 1 ABS ABS sign housing 1 1 3 Explanation Fix the ABS sign housing 1 on the main post with M8x20 flat screws...

Страница 15: ...10 11 12 UBX 400 16 UBX 400 17 UBX 400 18 UBX 400 19 UBX 400 20 UBX 400 21 UBX 400 22 UBX 400 23 UBX 400 24 UBX 400 25 UBX 400 32 2 3 4 8 7 6 5 9 10 11 12 Top Axis Small Axis Piston Piston Piston Pist...

Страница 16: ...ox Small Plate Tempered Screw 13 13 14 15 14 15 16 19 18 17 16 17 18 19 UBX 400 33 UBX 400 34 UBX 400 35 UBX 400 36 UBX 400 37 UBX 400 38 UBX 400 39 Kickbox Top Screw Kickbox Box Head Plate Kickbox Bo...

Страница 17: ...nd plate Make 3 anchor bolt go through the hole of ground plate and 1 2 Attach 4 cap washer and next 5 washer on the screw 3 Put both nuts on the bolt then close 2 plastic cap 4 Put 8 level shim under...

Страница 18: ...st 1 Stainless Rubber washer 1 pcs Explanation 1 Attach 3 rubber on the pull rod of piston Put 1 washer on top of the rubber 2 Attach 2 housing then put on 4 housing cap use 7 screw to lock the housin...

Страница 19: ...screws must be attached using LocTite 3 Prevent access until concrete completely dry Standard Safety Area Detailed View O U T D O O R F I T N E S S S O L U T I O N S Concrete Volume 365 Liters Concre...

Страница 20: ...S S S O L U T I O N S Parts List Comments It s recommended to revisit and tighten all the screws a week after site opening Drawing No Part Name Part No Material QTY 1 2 Main Post Main Handle UBX 400...

Страница 21: ...se levels of vandalism coastal location air pollution age of equipment If parts are discovered to be unsafe during inspection and cannot be replaced or corrected immediately the equipment or parts sho...

Страница 22: ...th Many routine maintenance tasks to inspect usage and function and need to be performed on a regularly scheduled basis of once a month General inspection Pass Fail Problem Solution Scratches or paint...

Страница 23: ...y routine maintenance tasks to inspect gym s structural integrity and need to be performed on a regularly scheduled basis at least once a year by experienced trained personnel General Hazards Pass Fai...

Страница 24: ...hould be paid to the areas adjacent to stainless steel components where corrosion on bare steel would be accelerated Any breaks in coating surface identified should be made good within 28 days Any bar...

Отзывы: