![UPT SkyHook II RSL Скачать руководство пользователя страница 12](http://html.mh-extra.com/html/upt/skyhook-ii-rsl/skyhook-ii-rsl_packing-instructions_1061368012.webp)
INSTRUCT-001 Rev 3
Page 12 of 12
10/10/2011
1.
19
. Thread the pull-up cord through the top
center flap (Flap #6).
20
. Replace the temporary pin with the reserve
pin, seating it to the depth as shown the left.
21
. Seal reserve in accordance with the
regulations in your area and close the pin cover.
ALWAYS COUNT YOUR TOOLS
WHEN FINISHED!
k
çíÉ=
If the force necessary to close the last
two flaps seems excessive, the loop may
be too short. Use a scale to determine
how much force is needed to extract the
pin; 8lb (3.6 kg) to 12lb (5.4kg) is correct.
A short loop can also bend the reserve
loop anchor.
t
~êåáåÖ
Make sure that the Skyhook lanyard goes
directly from the RSL lanyard to the
Skyhook hardware, without going under
or through anything. (Except flap #2A)