![UPRENT impulse MUMBAI IP Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/uprent/impulse-mumbai-ip-series/impulse-mumbai-ip-series_user-manual_1061225013.webp)
11
4.1 How to fill the pump housing with water
:
1. .Make shore all draining valves are closed.
2. Fill fully stone catcher with water, through suction side connector it is easier do connecting D100
F/M 90 degree connector (1)
4.2 Control panel
Impulse Mumbai is supplied with a star-delta switch, it has three
positions: Neutral (1), Star (2) and Delta (3).
WARNING
Turning the switch too slowly will cause the motor's thermal protection to trip. Return
the switch to the neutral position and switch it on again.
Содержание impulse MUMBAI IP Series
Страница 1: ...www uprent eu P U M P I N G A N D E N E R G Y S O LU T I O N S PUMP USER MANUAL...
Страница 3: ...1 OPERATION AND SAFETY REGULATIONS MUMBAI IP 175...
Страница 16: ...14...