© UPLIFT Desk
• 800-349-3839 • 512-614-3152 • [email protected] • upliftdesk.com
6
Step 1
Connect each Mobile foot to the bottom of the Posts
on a completed wall assembly using four M5x25 Ma-
chine screws. If you are not attaching casters, have
a friend help you stand the Mobile Wall upright and
move it to the desired location.
Step 1
Take a completed Wall assembly and screw a Round
foot onto the bottom of each Post.
Step 2
If you have purchased casters, remove the Glide caps
and Glides. Install the casters, and replace the Glide
caps. Have a friend help you stand the Mobile Wall up-
right, and you can roll it to the desired location.
Foot Attachment - Mobile Wall
Parts Needed:
100mm Round Foot
with threaded post.
(qty 2, per wall)
Foot Attachment - Cubicle Wall
Parts Needed:
Mobile foot
with pre-installed glides & glide caps
(qty 2, per wall)
M5x25 Machine screw
(qty 8, per wall)
Step 2
Repeat this step for all of the Cubicle Walls you have
assembled, and lean them against an open wall until
you are ready to build the cubicle assembly.
Содержание Acoustics OneWall
Страница 2: ...Thank you for choosing UPLIFT ACOUSTICS ...