background image

361819-YIM-A-0208

Unitary Products Group

5

See "System Charge” section for checking and recording system
charge.

SECTION IV: INSTALLATIONS REQUIRING 

TXV

For installations requiring a TXV, the following are the basic steps for
installation. For detailed instructions, refer to the Installation Instructions
accompanying the TXV kit.

Install TXV kit as follows:

1.

First, relieve the holding charge by depressing the Schrader valve
located in the end of the liquid line.

2.

After holding charge is completely discharged, loosen and remove
the liquid line fitting from the orifice distributor assembly. Note that
the fitting has 

right

 

hand

 

threads

.

3.

Remove the orifice from the distributor body using a small diame-
ter wire or paper clip. Orifice is not used when the TXV assembly
is installed.

4.

After orifice is removed, install the thermal expansion valve to the
orifice distributor assembly with supplied fittings. Hand tighten and
turn an additional 1/8 turn to seal. Do not overtighten fittings.

5.

Reinstall the liquid line to the top of the thermal expansion valve.
Hand modify the liquid line to align with casing opening.

6.

Install the TXV equalizer line into the vapor line as follows:

a.

Select a location on the vapor line for insertion of the equal-
izer line which will not interfere with TXV bulb placement.

b.

Use an awl to punch through the suction tube and insert the
awl to a depth to achieve a 1/8” diameter hole.

7.

Install TXV equalizer line in 1/8” hole previously made in vapor
line. Equalizer line should not be bottomed out in vapor line. Insert
equalizer line at least 1/4” in the vapor line. Braze equalizer line
making sure that tube opening is not brazed closed.

All connections to be brazed are copper-to-copper and should be
brazed with a phosphorous-copper alloy material such as Silfos-5 or
equivalent. DO NOT use soft solder.

Install the TXV bulb to the vapor line near the equalizer line, using the
two bulb clamps furnished with the TXV assembly. Ensure the bulb is
making maximum contact. Refer to TXV installation instruction for view
of bulb location.

a.

Bulb should be installed on a horizontal run of the vapor line if
possible. On lines under 7/8" OD the bulb may be installed on
top of the line. With 7/8" OD and over, the bulb should be
installed at the position of about 2 or 10 o'clock.

b.

If bulb installation is made on a vertical run, the bulb should
be located at least 16 inches from any bend, and on the tub-
ing sides opposite the plane of the bend. The bulb should be
positioned with the bulb tail at the top, so that the bulb acts as
a reservoir.

c.

Bulb should be insulated using thermal insulation provided to
protect it from the effect of the surrounding ambient tempera-
ture.

SECTION V: ELECTRICAL CONNECTIONS

GENERAL INFORMATION & GROUNDING

Check the electrical supply to be sure that it meets the values specified
on the unit nameplate and wiring label.

Power wiring, control (low voltage) wiring, disconnect switches and over
current protection must be supplied by the installer. Wire size should be
sized per NEC requirements.

The complete connection diagram and schematic wiring label is located
on the inside surface of the unit service access panel and this instruc-
tion.

FIELD CONNECTIONS POWER WIRING

1.

Install the proper size weatherproof disconnect switch outdoors
and within sight of the unit.

2.

Remove the screws at the bottom of the corner cover. Slide corner
cover down and remove from unit. See Figure 5.

3.

Run power wiring from the disconnect switch to the unit.

4.

Remove the service access panel to gain access to the unit wiring.
Route wires from disconnect through power wiring opening pro-
vided and into the unit control box.

5.

Install the proper size time-delay fuses or circuit breaker, and
make the power supply connections.

6.

Energize the crankcase heater if equipped to save time by pre-
heating the compressor oil while the remaining installation is com-
pleted.

Never attempt to repair any brazed connections while the system is
under pressure. Personal injury could result.

 Dry nitrogen should always be supplied through the tubing while it
is being brazed, because the temperature required is high enough
to cause oxidation of the copper unless an inert atmosphere is pro-
vided. The flow of dry nitrogen should continue until the joint has
cooled. Always use a pressure regulator and safety valve to insure
that only low pressure dry nitrogen is introduced into the tubing.
Only a small flow is necessary to displace air and prevent oxidation.

 In all cases, mount the TXV bulb after vapor line is brazed and has
had sufficient time to cool.

All field wiring must USE COPPER CONDUCTORS ONLY and
be in accordance with Local, National Fire, Safety & Electrical
Codes. This unit must be grounded with a separate ground
wire in accordance with the above codes.

 FIGURE 5: 

Typical Field Wiring

CONTROL
WIRING

POWER
WIRING

CORNER
COVER

SERVICE
ACCESS
PANEL

Содержание YZE03811 SERIES

Страница 1: ...ty dam age Improper installation may create a condition where the operation of the product could cause personal injury or property damage Improper installation adjustment alteration service or mainte nance can cause injury or property damage Refer to this manual for assistance or for additional information consult a qualified con tractor installer or service agency This product must be installed i...

Страница 2: ...ground area the unit should be raised sufficiently above the roof or ground to avoid taking the accumulated layer of hot air into the outdoor unit Provide an adequate structural support ADD ON REPLACEMENT RETROFIT When this unit is being used as a replacement for an R 22 unit it is required that the outdoor unit indoor coil and metering device all be replaced The following steps should be performe...

Страница 3: ...ll a line will result in loss of capacity and other problems caused by insufficient refrigerant flow Slope horizontal vapor lines at least 1 every 20 feet toward the out door unit to facilitate proper oil return PRECAUTIONS DURING LINE INSTALLATION 1 Install the lines with as few bends as possible Care must be taken not to damage the couplings or kink the tubing Use clean hard drawn copper tubing ...

Страница 4: ...rvice port connection After this con nection has cooled remove the nitrogen source from the liquid fit ting service port 7 Replace the Schrader core in the liquid and vapor valves 8 Go to SECTION IV for TXV installation 9 Leak test all refrigerant piping connections including the service port flare caps to be sure they are leak tight DO NOT OVER TIGHTEN between 40 and 60 inch lbs maximum 10 Evacua...

Страница 5: ...ertical run the bulb should be located at least 16 inches from any bend and on the tub ing sides opposite the plane of the bend The bulb should be positioned with the bulb tail at the top so that the bulb acts as a reservoir c Bulb should be insulated using thermal insulation provided to protect it from the effect of the surrounding ambient tempera ture SECTION V ELECTRICAL CONNECTIONS GENERAL INF...

Страница 6: ...educed air flow lowering evaporator temperature and increasing latent capacity The humidistat in this control opens the humidistat contacts on humidity rise To install refer to instructions packaged with the acces sory and Figures 7 12 Prior to the installation of the dehumidification control the jumper across the HUMIDISTAT terminals on the indoor variable speed air handler or furnace CFM selecti...

Страница 7: ...tage Aux Heat W2 Second Stage Aux Heat DHM Dehumidistat HM Humidistat O Reversing Valve Energized in Cool Change FFuel jumper on the heat pump control to ON Part Numbers SAP Legacy 126768 031 09137 18395 031 01996 340512 031 09178 1 1 Part Numbers SAP Legacy 265904 031 09169 2 C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor TWO STAGE VARIABLE SPEED FURNACE CONTROL G Fan TWO STAGE VARIABL...

Страница 8: ... to YES if humidistat is to be used PV 8 9 ID MODELS F L 8 9 V YORKGUARD VI CONTROL G L 8 9 V YZE OD MODELS YZH H 5 H 8 C 24 Volt Common R 24 Volt Hot Y1 First Stage Compressor O Reversing Valve Energized in Cool L Malfunction Light Y2 Second Stage Compressor G Fan DN22H00124 DP22U70124 THERMOSTAT E W1 First Stage Aux Heat W2 Second Stage Aux Heat C 24 Volt Common Y First Stage Compressor O B Reve...

Страница 9: ...9481 031 09157 2 COM 24 Volt Common R 24 Volt Hot W1 First Stage Aux Heat W2 Second Stage Aux Heat Y1 Single Stage Compressor Y Y2 Second or Full Stage Compressor O Reversing Valve Energized in Cool X L Malfunction Light HUM Dehumidification Open on Humidity Rise VARIABLE SPEED AIR HANDLER CONTROL G Fan Move the MODE jumper to HP Move the HUM STAT jumper to YES if humidistat is to be used VARIABLE...

Страница 10: ...ype must be set to 12 3 Heat 2 Heat Pump Thermostat Installer Setup 0190 Changeover Valve must be set to 0 O B terminal Energized in Cooling Thermostat Installer Setup 0200 Backup Heat Source must be set to 0 Heat Pump Backup Heat Source is Electric AUX Auxiliary Heat 1 24VAC Humidifier Optional Part Numbers SAP Legacy 159481 031 09157 2 COM 24 Volt Common R 24 Volt Hot W1 First Stage Aux Heat W2 ...

Страница 11: ...e Aux Heat DHM Dehumidistat HM Humidistat O Reversing Valve Energized in Cool C 24 Volt Common R 24 Volt Hot Y1 Single Stage Compressor VARIABLE SPEED MODULATING FURNACE CONTROL G Fan VARIABLE SPEED MODULATING FURNACE Y Y2 Second or Full Stage Compressor HUM Dehumidification Open on Humidity Rise W Modulating Heat Change FFuel jumper on the heat pump control to ON 1 Part Numbers SAP Legacy 171334 ...

Страница 12: ...1 01996 340512 031 09178 1 PC 8 9 ID MODELS FC 8 9 C FL 8 9 C YZE OD MODELS YZH H 5 H 8 C 24 Volt Common R 24 Volt Hot Y1 First Stage Compressor O Reversing Valve Energized in Cool L Malfunction Light Y2 Second Stage Compressor G Fan DN22H00124 DP22U70124 THERMOSTAT E W1 First Stage Aux Heat W2 Second Stage Aux Heat C 24 Volt Common Y First Stage Compressor O B Reversing Valve L Malfunction Light ...

Страница 13: ...is required during heating operation the unit must be evacuated and charge weighed in per the marking on the rating plate For the cooling operation the recommended subcooling is typically around 10 F This may vary greatly based on each unique system 1 Set the system running in the cooling mode by setting the thermo stat at least 6 F below the room temperature 2 Operate the system for a minimum of ...

Страница 14: ...r to prevent the migration of refrigerant to the compressor during the OFF cycle The heater is energized only when the unit is not running If the main switch is disconnected for long peri ods of shut down do not attempt to start the unit until 8 hours after the switch has been connected This will allow sufficient time for all liquid refrigerant to be driven out of the compressor The installer shou...

Страница 15: ...361819 YIM A 0208 Unitary Products Group 15 SECTION X WIRING DIAGRAM FIGURE 14 Wiring Diagram ...

Страница 16: ...ct to change without notice Printed in U S A 361819 YIM A 0208 Copyright by Unitary Products Group 2008 All rights reserved Supersedes 128596 YIM A 0505 Unitary 5005 Norman Product York OK Group Drive 73069 ...

Отзывы: