background image

 

 

PRO Series Complete Guide to Simple 

Setup and Operation 

Corner Desk 

 

 

 

Содержание PRO Series

Страница 1: ...PRO Series Complete Guide to Simple Setup and Operation Corner Desk ...

Страница 2: ...Step 1 8 2 3 Step 2 9 2 3 Step 3 10 2 3 Step 4 11 2 3 Step 5 13 2 3 Step 6 14 2 3 Step 7 16 2 3 Step 8 17 2 3 Step 9 19 2 3 Step 10 20 2 4 Desktops Installation 22 2 5 Control Panel Installation 27 2 6 Cable Tray Installation Optional extra 29 2 7 Control Panel Operation 30 2 8 Troubleshooting 34 2 9 Packaging recycling and disposal 35 ...

Страница 3: ...ing and your body will thank you for it This instructional manual will guide you smoothly through the process of assembling the frame attaching the optional cable tray and installing the desktops with the control panel Required tools Philips head screwdriver Measuring tape Optional tools to simplify desktop installations Power drill 2 5mm drill bit ...

Страница 4: ...x short corner foot 3 2 x joining bars 4 2 x pivot plates 5 3 x legs 6 1 x short corner wing 7 2 x regular wings 8 4 x spreader bars 9 1 x control panel 10 1 x control box 11 1 x power cable 12 2 x short motor cables inc 1 spare 13 1 x medium motor cable 14 1 x long motor cable ...

Страница 5: ...st Bag 2 is specific to the corner desk There may be some unused bolts screws once assembly installation is complete M8 x 20mm 12 pieces in total Allen key required supplied Used to attach feet to the legs M6 x 10mm 4 pieces in total Philips head screwdriver required not supplied Used to attach the control box to the adjustable tubes M8 x 10mm 22 pieces in total ...

Страница 6: ...ings spreader bar used to attached spreader bars to pivot plates Self tapping screws 22 pieces in total Philips head screwdriver required not supplied Power drill optional not supplied Used to attach the frame control panel and optional cable tray to the desktop s ...

Страница 7: ...e using 2 x spreader bars 2 x legs 1 x regular wing 1 x regular foot 1 x short corner wing 1 x short corner foot 2 x pivot plates Arrange the parts as shown ensuring the spreader bar control box tabs face inwards and the desktop connector tabs facing outwards Both sets of tabs should be adjacent to the ground as shown above ...

Страница 8: ...8 2 3 Step 2 Using the Allen key provided loosen do not remove the 8 pre installed grub screws of the spreader bars as indicated below The bars should be able to slide relatively freely ...

Страница 9: ...9 2 3 Step 3 Install the first leg onto the spreader bars and regular wing using 6 x M8x10mm screws ...

Страница 10: ...10 2 3 Step 4 Moving to the second leg install the pivot plates as shown using 3 x M8x10mm screws per pivot plate Important Each pivot plate has a step and must only be installed exactly as shown ...

Страница 11: ...11 The short corner wing can now be installed use 2 x M8 x 10mm screws ...

Страница 12: ...2 2 3 Step 5 Install the pivot plate to the spreader bars using the holes as shown using 2 x M8x10mm screws Do NOT tighten the spreader bar must be able to pivot within the pivot plate slot at this point ...

Страница 13: ... 2 3 Step 6 Attached both feet The short foot uses 2 x M8x20mm screws and the regular foot uses 4 x M8x20mm screws Flip the assembly over and position it as close as possible to its final desired location ...

Страница 14: ...14 In preparation for the next steps it s advisable to ensure the pivot plate to spreader bar angle is approximately 90 degrees as shown below ...

Страница 15: ... Step 2 from earlier ensure the spreader bar tabs are correctly positioned and adjacent to the ground o Loosen do not remove 8 grub screws o Assemble spreader bar and regular wing onto the leg using 6 x M8x10mm screws o Assemble regular foot onto the leg using 4 x M8x20mm screws ...

Страница 16: ... the spreaders bars on the pivot plate as shown Accessing the frame from underneath connect the spreader bar to the pivot plate using 2 x M8x10mm screws Do not tighten at this point the spreader bar should be able to pivot within the pivot plate slot ...

Страница 17: ...17 Once again keep the spreader bar pivot plate of the 3rd leg assembly at approximately 90 degrees as shown below ...

Страница 18: ...go as this dictates the side the control box is mounted to The control box should be mounted on the side closest to the future control panel location Control panel location is entirely personal preference Install the control box to the spreader bar tabs as shown using 4 x M6x10mm screws ...

Страница 19: ...to the middle leg motor and long cable to the farthest leg To assist with cable management later it s useful to run the long cable behind the middle motor as shown Final cable management will occur later once the desktops have been installed Install the power cable and control panel cable into the control box ...

Страница 20: ...power cable into a 240v power source The frame should now be operational It s useful to elevate the frame to a workable height that suits you for installing the desktops as you will need to work underneath the desk ...

Страница 21: ...approximately 10cm gap in the spreader bars as shown The markings are in 5cm increments These measurements will result in approximately 10cm of overhang on the main desktop side There is flexibility on this distance depending on your requirements For example you may have under desk drawers or obstacles that you need to work around Place the desktop onto the frame so that there is in approximately ...

Страница 22: ...rkings for a 120cm top and 1 6 markings for a 150cm top It s also advisable to keep the control box parallel to the spreader bars as shown by ensuring mounting tabs stay directly opposite one another Place the return desktop on the frame ensuring it s butted up to the main desktop ...

Страница 23: ...he steps above using a pen marker place a dot in the middle of each affixing point Remove the frame in preparation for drilling Using a power drill and a 2 5mm drill bit drill a hole between 10 12mm deep IMPORTANT Be extremely careful not to drill further as you may run the risk of drilling all the way through the desktop The frame can then be attached using the self tapping screws either with a m...

Страница 24: ...nstalled You may need to wriggle the frame around to achieve the results described below This step applies to both the main desktop and return desktop Beginning with the large desktop in this case 180cm finalise the overhang and squareness to the frame We generally recommend approximately 10cm of overhang for a desktop although 5cm either direction is acceptable The desktop should be evenly positi...

Страница 25: ...25 Install 4 four self tapping screws firmly into the wing and spreader bar in the locations shown below Repeat the aforementioned steps with the return desktop ...

Страница 26: ...its position Tighten up all 16 grub screws on spreader bars Tighten the loose M8 x 10mm screws on both pivot plates 2 on each plate Install all frame to desktop self tapping screws 2 per spreader bar and 2 for the short wing of the centre leg Using the supplied Cable management straps secure any loose and dangling cables You should raise lower the desk entirely before finalising cable management o...

Страница 27: ...o locate the control panel wherever you wish Most people situate it on the leading edge to the far right or left depending on their hand preference Use 2 self tapping screws to install it Above examples use a 2 legged desk flipped upside down The corner desk will require you to install from underneath the desk ...

Страница 28: ...l notice a thin soft padding This side always goes against the desk It s to protect the desk from being scratched and prevent squeaking If you peer through each of the large holes of the cable tray you will notice a small hole on the other side Using a screwdriver and a self tapping screw screw all the way through the soft padding and into the timber Screw both screws in firmly until they sit tigh...

Страница 29: ...eels to your frame The desk has a built in anti collision safety feature whereby any interference or severe resistance experienced automatically stops the up down movement of the desk and rebounds it a small amount The sensitivity for this can be adjusted The Control Panel display will switch off after 30 seconds of no use To reactivate press the Up or Down button once Control Panel Function Setti...

Страница 30: ... through the menu until you reach B 3 Press M4 once 4 Use the Up and Down buttons to scroll through 1 2 1 indicates cm units 2 indicates inch units 5 Press M3 twice to exit If you make any errors or need to start the above instructions again simply press the M3 button twice C Height correction adjustment If you re adding a thicker or thinner desktop than 2 5cm or adding castor wheels the display h...

Страница 31: ...just measured of the obstruction 6 Press M3 twice to exit Your desk will not go below this height If you make any errors or need to start the above instructions again simply press the M3 button twice E Maximum height setting If you have an obstruction above the desk or above your monitors such as a windowsill or printer tray you should set a maximum height This will ensure that an interference doe...

Страница 32: ...tton for approximately 10 seconds until you hear the 2nd audible beep Release your finger from the button The letter A will be displayed 2 Use the Up and Down buttons to toggle through the menu until you reach F 3 Press M4 once 4 Use the Up and Down buttons to scroll through 1 4 1 being the most sensitive 3 being the least sensitive and 4 turns off the anti collision 5 Press M3 twice to exit If yo...

Страница 33: ...k to the minimum height to reset Hot Continuous over usage approx 1min continuous usage every 10min 1 Reduce load on desk 2 Turn power off at the power point 3 Wait 5 minutes 4 Turn power back on and lower the desk to the minimum height to reset Desk stuck at a certain height Follow the instructions above for minimum height setting or maximum height setting Set the minimum height to 64 and the max...

Страница 34: ... and customers suggestions here are some ideas to help you upcycle recycle reuse or dispose of the packaging Retain the boxes containing frame components in the event you need to move locations it s the best way to transport your frame unassembled The boxes with EPE foam attached make great play equipment for kids makeshift doll houses matchbox car parks etc Any cardboard can be recycled without t...

Отзывы: