UNMAK technopel Скачать руководство пользователя страница 6

P a g e

 | 5

 
 

 

Technopel Compact Pellet Boiler Installation and User’s Manual 

 

 

 

WARNING 
Please  do  not  use  sharp  and  cutting  tools  to  avoid  damaging  the  pellet  boiler  while 
unpacking

 

 

 

 

WARNING 

Please avoid any crush injuries to hands and feet during transportation, installation, and 
assembly.

 

SELECTION OF INSTALLATION PLACE 

 
Installation 
 
The installation place of the product must have sufficient free space for assembly, maintenance and 
operation of the boiler. 
 
The gearbox and the burner (to which the spiral is connected) must be placed at a sufficient distance 
from the wall for service requirements. Please follow the instructions of “Dimensions of Installation 
Place” in that stage. 
 
In addition, there  should be  sufficient  fresh air circulation, the chimney design model should meet 
the  stack  draught  requirements.  The  chimney  construction  criteria  and  relevant  regulations  in  this 
manual must be followed. The pellet boiler should never be installed in open areas, balconies, living 
areas (kitchen, living room, bathroom, bedroom), or in places where explosive and easily flammable 
materials are present. 
 
The boiler room door must not open directly to the escape ladder or the general use ladder. It should 
open to safeway hall. Doors opening from the boiler room to the building must have at least 10 cm 
height  from  the  floor.  If  the  boiler  room  can  be  illuminated  naturally,  please  make  sure  that  the 
lighting openings do not overlap with other windows of the building. System that does not dazzle but 
illuminates the apartment well should be installed when there is no natural illumination. Boiler room 
main switch and panels will be placed around the entrance door and should be of leakproof type.  
 
There must be at least one 6 kg multiple purposes dry chemical powder type fire extinguisher in the 
boiler  room.  The  rupture  surface  should  be  designed  if  natural  gas or  liquid  fuel  boilers  use  in the 
same boiler room. 
 
The area should be connected directly to the outdoors and have vents that allow fresh air to enter. 
One of the grates should be 40 cm below the ceiling of the boiler room and the other 50 cm above 
the  floor. These grids should always  be  open. The  lower part should be  at least  40x40 cm and the 
upper  part  should  be  at  least  30x30  cm.  Pets  should  not  be  fed  in  the  central heating  area  (boiler 
room), they may be affected by smoke. Food and beverages should not be stored in this area. 
 
All electrical and water systems must be installed by the plumbers of authorized technical services. 
Installation must be done by the plumbers in order to comply with all legal and technical regulations. 
 

Содержание technopel

Страница 1: ...el Compact Pellet Boiler Installation and User Manual ÜNLÜSOY Yapı Malzemeleri Sanayi ve Ticaret Ltd Şti Pancar Organize Sanayi Bölgesi 2 Etap No 2 Torbalı İZMİR Tel 444 35 32 Faks 0232 469 2412 www unmak com ...

Страница 2: ...3 SHIPPING AND HANDLING 4 SELECTION OF INSTALLATION PLACE 5 SAFETY PRECAUTIONS 7 ELECTRICAL CONNECTION 8 TECHNICAL SPECIFICATIONS 9 INSTALLATION SYSTEM RULES 10 CONTROL BOARD AND USER INTERFACE 13 REMARKS OF USER INTERFACE 14 COMMISIONING 15 MAINTENANCE CLEANING PROCESS 16 TROUBLESHOOTING GUIDE 17 DOK 05 Rev 210324 ...

Страница 3: ... s Manual This manual covers following models TECHNOPEL 15 24 36 48 Please contact your local Authorized Technical Service for Commissioning Start of the Warranty Period and Failure Report or Please call 90 444 35 32 for the Call Center ÜNMAK After Sales Department ...

Страница 4: ...ter with a boiler or heat exchanger The energy requirement for domestic water will be supplied from boiler energy ÜNMAK Pellet boilers transform the energy of the fuel inside the hopper from chemical to heat energy and supply to the liquid of central heating system The powdered fuels will pass through the combustion chamber with the fume extractor Efficient combustion is not seen in this type of f...

Страница 5: ...ies such as circulation pump fume extractor closed expansion tank and safety valves are sent with the boiler Safe Handling Due to the heavy weight of the product special care should be taken during handling to the installation place The net weight of each product is already indicated in the technical specifications table Therefore the equipment that has sufficient capacity for the lift action shou...

Страница 6: ...pen to safeway hall Doors opening from the boiler room to the building must have at least 10 cm height from the floor If the boiler room can be illuminated naturally please make sure that the lighting openings do not overlap with other windows of the building System that does not dazzle but illuminates the apartment well should be installed when there is no natural illumination Boiler room main sw...

Страница 7: ...d to ensure minimum dimensions around the boiler as shown in the figure below It is necessary to consider the distance to add the bunker when the boiler is placed The burner under the bunker should be easily removed and able to work comfortably A At least 80 cm is required for comfortable use of the cleaning arm and technical service actions B At least 100 cm is required for assembly and disassemb...

Страница 8: ...e can be taken out from the back of the boiler room The flue cap must put to the outlet section of the chimney It can be made of metal or heat resistant material Please do not overload the boiler do not open the boiler door and also don t feed pellets into the combustion chamber Gearbox operating and stopping period should be set into the system such as a program These settings depend on many para...

Страница 9: ...tank cover must be kept closed WARNING The cold water should not be directly added to the overheated boiler for any reason of cooling purposes ELECTRICAL CONNECTION ÜNMAK Technopel Series Pellet Boilers requires 230 V 50 Hz electricity supply The regulator should be used in the place that 10 or 10 of the mains voltage All wiring and additional grounding outside the boiler must comply with local el...

Страница 10: ...ld not be installed indoors and in living spaces It is necessary to control the water pressure value of the manometer inside the left front door while adding water to the boiler It will be sufficient to adjust the pressure to 1 bar before ignition The pressure will increase as the boiler heats up The safety valve will open when the pressure is 3 bar and will close after the pressure drop The disch...

Страница 11: ...th the pellet boiler and no need to add on to the installation when the hydronic connection of the boiler is completed It can be easily installed as the wiring diagram shows It is recommended to install an additional pump for installations with collectors usually in large installations The collector should also have a backup pump and a by pass line Installation with Accumulation Tank ...

Страница 12: ...ve and expansion tank must install to mains water Installation with Double Serpentine Hot Water Storage Tank There are two different types of coil in double serpentine hot water storage tank If we consider connecting a continuously operate energy source usually solar energy geothermal etc to the lower serpentine the pellet boiler can be connected to the upper serpentine Pressure reducer safety val...

Страница 13: ...st be insulated more than the internal parts of the installation Precautions for New Installations The design and size of the system must be done correctly to minimize water addition No material used in the installation should be the gas transmissions A synthetic or max a 50 micron metal filter must put to the additional water line Installation system pressure should be higher than atmospheric pre...

Страница 14: ...er water will be displayed when the Enter button is pressed Escape This button is used for cancelling the set value without save or escape from the menu Arrow buttons Arrow buttons are used to increase or decrease the numbers or display the functions of the control board Timer It is used to turn on and turn off the boiler with a time setting This button is used according to the opening and closure...

Страница 15: ...ox pending time 0 0 2000 s P1 3 Fan speed 600 3000 rpm P1 4 Transition time 0 600 s Power 2 P2 1 Gearbox feeding time 1 0 40 0 s P2 2 Gearbox pending time 0 0 2000 s P2 3 Fan speed 600 3000 rpm P2 4 Transition time 0 600 s Power 3 P3 1 Gearbox feeding time 1 0 40 0 s P3 2 Gearbox pending time 0 0 2000 s P3 3 Fan speed 600 3000 rpm P3 4 Transition time 0 600 s Power 4 P4 1 Gearbox feeding time 1 0 ...

Страница 16: ...e temperature with stop button 0 99 C V5 2 Adjustable minimum boiler temperature 40 50 C V5 3 Maximum chimney temperature 0 400 C V5 4 Starting temperature of no fuel check 0 100 C V5 5 No fuel temperature 0 100 C V5 7 Resumption 0 20 min V5 8 Flame out sensor temperature in Power parameters 40 150 C 150 cancel Various Parameters 2 V6 1 Fuel Level Sensor failure value 0 50 V6 2 Fuel Level Sensor f...

Страница 17: ...tomatic operation it goes starting from Power 3 to Power 6 respectively Power drops down until Power 0 when it reachs to the set temperature value Power 6 Power 5 Power 4 Power 3 Power 2 Power 1 100 80 60 50 40 30 The power mode can be selected according to requested value for the boiler power effective use percentage when you want to operate manually MAINTENANCE CLEANING PROCESS DANGEROUS Regular...

Страница 18: ...T Wear the safety gloves ALERT Wear the dust mask WARNING Possible finger and hand injuries due to automatic fan operation WARNING Possible finger and hand injuries due to automatic feeding gearbox WARNING Possible finger and hand injuries due to sharp sheet edge WARNING Possible injuries due to rotational tools TROUBLESHOOTING GUIDE PROBLEM POSSIBLE CAUSE SOLUTION Insufficient Heating Heat transf...

Страница 19: ... the empty of auger part Fan may not work Sift out the dust on pellet Reset and restart from the control panel Contact the authorized technical service Noisy sound of the boiler There may be trapped air inside the boiler when the first water is filled Fill the boiler with water from the lowest part Boiler water temperature drops too high but the boiler is still not work Limit thermostat fuse may b...

Отзывы: