It is not preferred method but in case of
necessity, it can be mounted from right
bottom side inlet or left bottom side
outlet or vice versa. This method is not
recommended due to the decrease in
radiator efficiency unless necessary.
RADIATOR COMMISSIONING
Pipework of the radiator must be connected with a hose from the lowest inlet level
of the system. Air bleeding should be done from highest outlet level. For this purpose
purger flange should be open. It is not necessary to determine this process for use at
open expanding system. The tap should be opened and the hose should be filled with
water, then the water should be connected to the point to be pressed. Air pressure
of system should be set to 1-1,5 bar by observing from manometer when filled from
the lowest elevation level. Necessary attention should be taken to avoid air in the
system.
MAINTENANCE&CLEANING
Regular controls:
Product should be check against for leaks. Please contact installation
company when leakage is observed.
Radiators must only clean by smooth glass cleaning microfiber cloth without
using chemicals.
Periodical controls:
The convector part of the panel radiator can be cleaned by removing the
side covers and top grill. Dust can be poured by using hair dryer without