LOADING PLATE UNITS INTO THE VS9 HOUSING
With the VS9 resting on a stable working surface, unlatch the front housing [Figure 1 (8)] and swing it toward you. Lift the assembled
plate unit and insert it into the rear housing [Figure 1 (10)]. Lift the shaft lock pin [Figure 1 (19)] and seat the plate unit with a gentle twist.
Make sure that the thrust bearing on the shaft has carried fully into place, and that the square milled end of the shaft has fully cleared the
rear hub [Figure 1 (15)]. Release the shaft lock pin, then close and securely latch the front housing.
The VS9 is now ready to mount to power source equipment.
DIAGRAM 2
PROPERLY LOADED VS9/VS9H
PAGE 5