32
Before actual connection make sure that:
•
The fuse and electrical system can withstand the load required by the hob;
•
The electrical supply system is equipped with an efficient earth hook-up
according to the norms and regulations prescribed by law;
•
The plug or switch are easily accessible.
The wires in the main lead are coloured in accordance with the following code:
Green & Yellow
Earth
Blue
Neutral
Brown
Live
As the colours of the wires in the main lead may not correspond with the coloured
markings identifying the terminals in your plug, proceed as follows: Connect the Green
& Yellow wire to terminal marked “E” or
or coloured Green or Green & Yellow.
Connect the Brown wire to the terminal marked “L” or coloured Red.
Connect the Blue wire to the terminal marked “N” or coloured Black.
6.
ADAPTING THE UNIT TO DIFFERENT GAS TYPES
Adapting de Gas hob for Different Types of Gas
G20/25
G25.1
G27
G2.350
G30
G31
Burner
Therma
l
power
(kW)
Nozzle
1/100
(mm)
Therm
al
power
(kW)
Nozzle
1/100
(mm)
Therm
al
power
(kW)
Nozzle
1/100
(mm)
Therm
al
power
(kW)
Nozzle
1/100
(mm)
Therm
al
power
(kW)
Nozzle
1/100
(mm)
Nozzle
1/100
(mm)
Nozzle
1/100
(mm)
Ther
mal
power
(kW)
Nozzle
1/100
(mm)
Auxiliary
(Small) (A)
1.00
71
1.00
75
1.00
79
1.00
98
1.00
52
(mm)
(mm)
1.00
52
Semi rapid
(Medium)
1.80
97
1.80
105
1.80
106
1.80
125
1.80
67
64
59
1.80
67
Rapid (R)
2.40
110
2.40
118
2.40
120
2.40
138
2.40
77
72
67
2.40
77
Triple Ring
(TR)
3.40
125
3.40
142
3.40
143
3.40
185
3.40
93
88
82
3.40
93
Supply
pressures
20 mbar
25 mbar
20 mbar
13 mbar
30
mbar
37
mbar
50
mbar
37 mbar
In 15ºC v
1013 mbar-dry gas
P.C.I.G20
37.78 MJ/m³
P.C.I.G25.1
32.51 MJ/m³
P.C.I.G25
32.49 MJ/m³
P.C.I.G27
30.98 MJ/m³
P.C.I.G2.350
27.20MJ/ m³
P.C.I.G30
49.47MJ/Kg
Содержание UECGDBLACK-19
Страница 40: ...40 www universalblue es ...