background image

                                                              

 

Operation Manual 

 

22

                              7. MAINTENANCE, INSPECTION 

 
7.1 Safety Check 

Check the points listed before operating the machine. These checks are necessary for safe 
machine operation: 
1.  Try to run the game before operation each day. 
2.  Conduct monthly routine checks of game components ensure good working condition 
3.  Check the machine regularly for dust and clean when necessary.   
Note: 

Parts and components require preventative maintenance to be kept running smoothly 

 

7.2 Handling Precautions

 

When installing or inspecting the machine, be very careful of the following points and 

pay attention to ensure that the player can enjoy the game safely.   

Non-compliance with the following points or inappropriate handling running counter to 

the cautionary matters herein stated can cause personal injury or damage to the machine 

 

 
•  Before servicing the machine, be sure to turn power off. Servicing without turning the 
 

power off can cause electric shock or short circuit.   

•  To avoid electric shock or short circuit, do not plug then unplug the power quickly 
•  Do not expose power cords and earth wires, these are susceptible to damage. 
•  Damaged cords and wires can cause electric shock or short circuit and should be 
 replaced 

immediately. 

•  When or after installing the product, avoid pulling the power cord to prevent 
 

unnecessary wear and tear. Use the power button to disconnect power.   

•  In case the power cord is damaged, ask for replacement through where the product was 
 

purchased from or replace locally. Continued usage of damaged cord can cause fire, 

 

electric shock or leakage. 

•  Perform grounding appropriately. Inappropriate grounding can cause electric shock. 
•  Use fuses that meet specified rating. Fuses exceeding can cause an    electric shock. 

 

 

Should a problem occur, turn off the power immediately and stop operating the 
machine. Unplug the power cord of the service outlet. Operating the machine 
without correcting the problem may cause a fire or injuries. 

 

Insert the power plug securely into the outlet. Poor contact may cause overheating, 
resulting in fire or burns. 

 

To ensure the warning labels attached on the machine are visible and legible, install 
the machine in a well-lit location, and keep the labels clean at all times. Make sure 
the labels are not hidden behind other game machines. 

 

 

WARNING

Содержание Checky Monkey

Страница 1: ...Operation Manual www universal space com...

Страница 2: ...ual 1 CONTENT Important Safety Instructions 1 1 SPECIFICATIONS 5 2 PACKAGE CONTENTS 6 3 PART NAMES 7 4 SET UP INSTALLATION 9 5 HOW TO PLAY 13 6 GAME OPTION 14 7 MAINTENANCE INSPECTION 22 8 OVERALL CON...

Страница 3: ...r the owner and or personnel in charge of product operation Carefully read and understand the instructions If you need any help during installation and setup please utilize this manual and troubleshoo...

Страница 4: ...ed by signs of warning Depending on the potential hazardous degree the terms NOTE NOTICE and WARNING are used NOTE A NOTE indicates useful hints or information about product usage NOTICE A NOTICE indi...

Страница 5: ...mable gas may be present or in the vicinity of highly inflammable volatile chemicals or items that can easily catch fire On unstable or sloped surfaces The machine may topple or cause unforeseen accid...

Страница 6: ...50 60Hz Mix Power consumption 140W Max Power consumption 160W Dimensions W1840 D870 H2030 mm Weight About 189Kg NOTICE After turning off the game please wait at least 1 minute before restarting again...

Страница 7: ...000 Manual English 1 Choose by area 4 C118 424 000 Key 171 2 Service door 5 C118 425 000 Key 2222 2 Coin box door 6 C118 426000 Basketball 10 7 C118 427 000 Bearing with shaft 6002ZZ 2 8 C118 117 000...

Страница 8: ...Operation Manual 7 Coin door Assy 3 PART NAMES FRONT VIEW Ball gate upper board Header ASSY JP LED Socre LED Time ticket LED R_side net Front net R_speaker Ball gate L_speaker Swing Assy L_side net...

Страница 9: ...Operation Manual 8 3 PART NAMES REAR VIEW Back door up Back door down Wire box Cabinet...

Страница 10: ...surface z Ventilation openings in the back of the unit must not be obstructed by objects or by wall 4 1 Play Zone This machine requires space for playing and for maintenance as shown below Leave space...

Страница 11: ...s installed on an unsuitable floor it could cause a malfunction To fix the game adjust the Leveler down until it touches the floor lifting the casters off the ground by 5mm Repeat the same for all lev...

Страница 12: ...the ground NOTICE Be careful not to damage the machine during transport The machine should be handled with care when bringing it down from a higher level Always unplug the game before moving Keep the...

Страница 13: ...ctrical outlet as it could generate heat and fire resulting from overload Connect the grounding conductor to the earth terminal GND WARNING Ensure no heavy objects rest on the power cord Check to make...

Страница 14: ...is counting down Rim is not moving 2 points per shot Time is up Pay out tickets if not passing the Stage 1 Get the required points to pass the next stage Time is counting down Rim is moving 3 points...

Страница 15: ...ration Manual 14 6 GAME OPTION 6 1 Switches control singal Refer the attached I O chart and the schematic To adjust DIP please refer the the I O chart The initial setting is in capitalization Main boa...

Страница 16: ...f on off SW Press TEST button again and LED displays 3 Press TEST button and LED displays 4 Hold IN1 40 and it shows OUT1 40 corresponding lighting ouput Press TEST button again and LED displays 5 it...

Страница 17: ...Note 1 2 Coin s per game 1 ON ON 2 off on 3 on off 4 off off 2 BONUS Item Content DIP Ajdust SW1 Note 3 4 5 BONUS 100 on on on 150 off on on 200 ON Off ON 250 off off on 300 on on off 350 off on off...

Страница 18: ...Ajdust 2 SW2 5 Game play time s Item Content DIP Ajdust SW2 Note 1 2 Game play time s 20 on on 30 OFF ON 40 on off 50 off off 6 Points for passing Item Content DIP Ajdust SW2 Note 3 4 5 Points for pa...

Страница 19: ...f ON DIP Ajdust 3 SW3 8 Game play time s Item Content DIP Ajdust SW2 Note 1 2 Game play time s 10 on on 15 Off ON 20 on off 25 off off 9 Adding points for passing Item Content DIP Ajdust SW2 Note 3 4...

Страница 20: ...ay Item Content DIP Ajdust SW4 Note 1 2 3 4 Infinity ON ON ON ON Max ticket per play 60 off on on on 40 on off on on 30 off off on on 25 on on off on 20 off on off on 15 on off off on 10 off off off o...

Страница 21: ...J9 6 J9 16 J9 26 J9 36 J9 7 Service btn J9 17 J9 27 J9 37 J9 8 J9 18 J9 28 J9 38 J9 9 J9 19 J9 29 J9 39 J9 10 J9 20 J9 30 J9 40 Output part Output Content Output Content Output Content Output Content...

Страница 22: ...er _L J20 2 POT_L d J19 2 1 SW signal J21 2 Ticket signal J27 2 Speaker _L J20 3 POT_R c J19 3 GND J21 3 12V J28 1 Speaker _R J20 4 POT_R d J19 4 2 Coin lock J21 4 GND J28 2 Speaker _R J20 5 POT_L e J...

Страница 23: ...Do not expose power cords and earth wires these are susceptible to damage Damaged cords and wires can cause electric shock or short circuit and should be replaced immediately When or after installing...

Страница 24: ...Operation Manual 23 8 OVERALL CONSTRUCTION 8 1 Main Assembly...

Страница 25: ...3 00 Ball gate Assy 1 Assembly 9 C118 003 000 WPXH 00 01 Coin door Assy 1 Assembly 10 C118 502 000 WPXH 01 08M Front board 1 Plywood 15 11 C118 104 000 WPXH 00 06 L_side net 1 14 12 C118 004 000 WPXH...

Страница 26: ...118 110 000 WPXH 01 26 Lock board 171 2 Q235 2 5 3 C118 403 000 25302222001 Lock 1 2222 4 C118 404 000 2310000006 Ticket machine 1 CL 022Q 386 5 C118 405 000 22301000001 Coin machine 1 6 C118 111 000...

Страница 27: ...Operation Manual 26 8 OVERALL CONSTRUCTION 8 3 Swing Assembly...

Страница 28: ...Operation Manual 27 8 OVERALL CONSTRUCTION 8 3 Swing Assembly...

Страница 29: ...ing parts 9 C118 121 000 WPXH 02 11 Fixation board 1 Q235 2 10 C118 122 000 WPXH 02 04 Guide track A 2 1 5 stainless steel 11 C118 505 000 WPXH 01 10M Main fixation board 1 Plywood 15 12 C118 602 000...

Страница 30: ...er Assembly No Part No Code Name Qty Spec Note 1 C118 130 000 WPXH 04 02 Back board 1 Q235 1 5 2 C118 408 000 22006000018 T5 tube 1 MXT Y14C 6400K 220V 3 C118 131 000 WPXH 04 01 Cabinet 1 Q235 1 5 4 C...

Страница 31: ...Operation Manual 30 8 OVERALL CONSTRUCTION 8 5 Ball gate Assembly...

Страница 32: ...118 133 000 WPXH 03 05 Guide track 2 Q235 4 C118 506 000 WPXH 03 07M Ball gate board 1 15 Plywood 5 C118 409 000 23404000047 DC motor 1 ZGB37 DC12V 6 C118 134 000 WPXH 03 01 Motor fixation board 1 Q23...

Страница 33: ...C118 414 000 21709000002 Pot Conncet board 1 VR PCB 4 C118 415 000 22402010002 Button 1 PB 11C02R Red 5 C118 416 000 21901000010 Fuse 1 5 20mm T6A 125VAC T3A 250VAC 6 C118 417 000 21902000006 Fuse ho...

Страница 34: ...2 000 21701000014 Mainboard 1 PLAY V9 3 C118 803 000 21704000214 Lamp control board 1 LED CON DDL PCB V1 1 4 C118 420 000 22140000002 Relay 1 SSR 25DA 5 C118 421 000 21901000018 Fuse 1 6 30mm T3A 250V...

Страница 35: ...Operation Manual 34 8 OVERALL CONSTRUCTION 8 8 Game menu Front...

Страница 36: ...Operation Manual 35 8 OVERALL CONSTRUCTION Back...

Страница 37: ...1 13 C118 737 000 WPXH HM 08 L_board back menu 1100 1585 PVC100u 1 14 C118 738 000 WPXH HM 07 L_board front menu 740 665 PVC100u 1 15 C118 739 000 WPXH HM 09 R_board front menu 740 665 PVC100u 1 16 C...

Страница 38: ...Operation Manual 37 Have Questions Contact us www zs shiyu com www universal space com Canada Office Parts Service 1 905 477 2823 Email service universal space com...

Отзывы: