Installation 

The probe tube (stinger) should be screwed into the 1/2” NPT fitting on the inside of the mounting flange. To 
prevent galling, coat the threads with an anti-seize compound. Remove and anti-seize compound from the 
inner wall of the probe tube before attaching it to the probe. The length of the probe should be selected to 
extend into the center third of the stack; or if the stack diameter is greater than 12’, at least 6’ into that stack. 
The studs on the mounting flange should be joined to the sampling nozzle on the stack and the assembly 
bolted into place. 
 
A heated sample line should be supported close to the Model 270. The heated sample line should be fed 
through the heat shrink boot on the bottom of the enclosure. Connect the sample tube to the center tubing 
fitting (3/8”) on the filter. The unheated portion of the sample line should be kept short and insulated to avoid 
condensation. Connect the calibration gas line to 1/4” tubing fitting located on the left side of the chamber and 
is connected to the chamber via a check valve. If the compressed air line is part of the heated sample line, it 
can be connected to the 1/4” fitting adjacent to the blowback accumulator. If an external airline is to be used 
for blowback, bring the air into the enclosure through a bulkhead fitting (supplied by others) to be installed in 
the wall of the enclosure, typically the mounting location is in the bottom of the enclosure, and connect the air 
to the same 1/4” fitting. 
 
Provide power to the terminal block(s) within the stack filter enclosure in the Model 270. 150 watts (without 
heated enclosure) or 350 watts with heated enclosure, at 115/230VAC is required. 

 

NOTE: The supply power circuit MUST include an overprotection device with a maximum 
rating of 20A. A disconnect switch must be located in close proximity to the probe. 

 

A thermal switch mounted in the aluminum heater will control the temperature to 340°F (171°C). 
Insure the power supplied to the heater matches the heater voltage requirement shown on the 
serial number tag. The voltage requirement can be changed by changing the jumpers on the 
terminal strips (reference terminal strip label or drawings for details). 

An independent ground 

wire should be run to the grounding terminal on the terminal strip. 
 

If an independent measurement and display of the oven temperature is desired, a temperature sensor can be 
slipped into a 1/8” diameter thermowell supplied on the heater tube assembly. 
 
The final installation step is to ensure that the sample line is insulated completely. Close the cover of the 
enclosure and secure the latches. After securing the heated sample line, use a heat gun to shrink the entry 
boot onto the sample line. The goal is to keep the temperature of the gas sample at a temperature above the 
dew point of the gas all the way from the stack to the sample cooler/dehydrator. 
 
 
 
 
 
 

 

Содержание 270SF

Страница 1: ...MAN 270SF REVB 102018 Instruction Manual Model 270SF Extractive Gas Sample Probe 5200 Convair Drive Carson City NV 89706 Ph 775 883 2500 Fax 775 883 6388 www universalanalyzers com ...

Страница 2: ... 0 Definition of Symbols 4 3 0 Product Identification 5 4 0 Specifications 7 5 0 Description and Principle of Operation 8 6 0 Installation 9 7 0 Start Up 10 8 0 Shutdown 11 9 0 Maintenance 12 10 0 Troubleshooting 13 11 0 Spare Parts 14 12 0 Drawings 270SF 15 13 0 Limited Warranty 16 ...

Страница 3: ... included with it immediately on arrival by removing them from the packing and checking for missing articles against the packing list Check the items for any damage in transit and if required inform the shipping insurance company immediately of any damage found Storage Location should be protected from the elements Although all components provided are designed to resist corrosion additional protec...

Страница 4: ...ES EXPOSED SURFACE TEMPERATURE CAN CAUSE BURNS OR PERSONAL INJURY CARE SHOULD BE TAKEN WHEN CONTACT IS REQUIRED CAUTION RISK OF ELECTRICAL SHOCK SYMBOL INDICATES ELECTRICAL SHOCK MAY OCCUR CAUTION SHOULD BE TAKEN BEFORE DISCONNECTING OR CONTACTING ANY ELECTRICAL CONNECTIONS PROTECTIVE CONDUCTOR TERMINAL SYMBOL INDICATES THE TERMINAL LOCATION FOR THE PROTECTIVE CONDUCTOR FAILURE TO CONNECT TO THE P...

Страница 5: ...op Dead Center F4T 4 Flange Top Dead Center F6T 6 Flange Top Dead Center Chamber Heat Control 340 340 F 171 C Temp Switch Standard Mandatory for FM ATEX Approved Units Standard 375 375 F 190 C Temp Switch 550 550 F 288 C Temp Switch use high temp chamber in Chamber Material R RTD Only includes 550 F safety switch K T C Only Type K includes 550 F safety switch J T C Only Type J includes 550 F safet...

Страница 6: ...ted on the Right Side of the 270 N None Extended Length Probe Tube Support not with HPA N Std PTS 2C Extended Length Probe Tube Support x Length in Ft 2 3 4 5 y Material of Construction S 316SS up to 1100 F 593 C T 310SS up to 1600 F 871 C C Hast C 276 up to 1900 F 1038 C 2S 2T 3C 3S 3T 4C 4S 4T 5C 5S 5T Heated Probe Adapter adds Terminal Blocks to 270 N None K Type K T C Terminal Blocks J Type J ...

Страница 7: ...Hz Input Power Requirement 150 watts With Optional Heated Enclosure 350 watts External fuse required of 20 A or less Electrical Classification General purpose Ambient Temperature Operating 200 F maximum 93 C Blowback Tank Volume 0 7 scf 19 8 l when at 100 psig 7 4 barg Blowback Duration 0 5 sec to empty accumulator Enclosure Nema 4x fiberglass standard Stainless steel optional Sample Line Connecti...

Страница 8: ...odel 270 The 2μm ceramic filter is supplied as an economical general purpose filter A similar ceramic filter with an internal 0 1μm coating is available for finer filtration or to provide a surface to enhance the blowback capability where the particulates have a tendency to fill the pores of the 2μm element A 2μm 316SS Filter can be inserted for those applications where the ceramic filter is deter...

Страница 9: ...d by others to be installed in the wall of the enclosure typically the mounting location is in the bottom of the enclosure and connect the air to the same 1 4 fitting Provide power to the terminal block s within the stack filter enclosure in the Model 270 150 watts without heated enclosure or 350 watts with heated enclosure at 115 230VAC is required NOTE The supply power circuit MUST include an ov...

Страница 10: ...flooded with calibration gas The excess calibration gas will pass through the probe tube into the stack Open the instrument air valve to charge the blowback accumulator Exercise the blowback solenoid valve to insure it is properly wired After a blowback cycle the presence of a slight pulse on the sample tubing in the analyzer shelter and the momentary dilution of the sample with instrument air is ...

Страница 11: ... is being drawn using a sample pump turn off the power to the pump or disconnect the sample line 4 If not already done disconnect the sample line 5 Use instrument air or other inert gas flow 10 l m for 15 30 minutes through the filter chamber Note Inert gas can be routed through the chamber via the calibration gas line 6 After purging is complete follow the maintenance procedure to change the filt...

Страница 12: ...not protected Removing the cover exposes the filter The cover is secured to the assembly with a retainer chain Reach into the heated oven with pliers to pull out the old filter Inspect the O Rings which are at each end of the filter to ensure they are still elastic and will seal the filter Replace O Rings if they are charred or deformed Replace the filter with a new one again handling it with plie...

Страница 13: ...ctive Ensure power has been applied to the unit for a minimum of 15 minutes Ensure power is supplied to the unit Check by measuring for AC voltage on TB1 1 2 Verify by measuring for a closed circuit between TB1 1 4 High oxygen readings low pollutant readings Leak Leaking past the filter element O Rings Remove filter element and inspect O Rings There are two O Rings one located at the base of the f...

Страница 14: ...ormally Closed Below 225 F 3103 0013 Low Temp Switch Normally Open Below 225 F 107 C Fail Safe 3103 0012 Valve Check 1 4 Tube X 1 4 Tube 316SS Set At 3 PSI 4955 0148 Optional Parts Part P N Heater Tube Assembly Incl Alum Oven Heater Elements Temp Switch s 3014 0002 Heater Tube Assembly Incl Alum Oven Heater Elements Temp Switch s Insulation Blanket Fail Safe 3014 0026 Solenoid Valve Blowback 2 Way...

Страница 15: ...nt revision of all Model 270SF Probe drawings visit the Universal Analyzers website https www universalanalyzers com Navigate to Products Gas Sample Probes Model 270SF Links to all current drawings for standard probe configurations are provided at the bottom of the page ...

Страница 16: ...defend indemnify and hold harmless Seller from any legal obligations in connection with such packing waste III PAYMENT A The term of payment shall be net 30 days from date of Seller s invoice unless otherwise specified Payments shall be made by Buyer without any deduction or set off Unless otherwise agreed payment shall be made in U S dollars Seller may charge late payment fees at the rate of 1 5 ...

Страница 17: ...use or application or 3 are normally consumed in operation or 4 have a normal life inherently shorter than the warranty period stated therein C No Products may be returned unless authorized in advance by Seller and then only upon such conditions to which Seller may agree Buyer must obtain a Return Material Authorization RMA number from Seller prior to any return shipment and such RMA number must a...

Страница 18: ...rned in all respects by the law of the Commonwealth of Pennsylvania U S A The exclusive forum for adjudication of any disputes shall be the federal or state courts of the Commonwealth of Pennsylvania and Buyer Seller hereby consent to personal jurisdiction and venue in such courts in any proceeding The United Nations Convention on the International Sale of Goods shall not apply B These Terms and C...

Отзывы: