Your furnace requires the following items to be assembled 

or installed by the service person:
•  Feed Door Pull Handle
•  Feed Door Locking Handle
•  Blowers and Blower Controls
•  Electrical Connections
1.  Remove all parts from inside the furnace and inspect 

for damage, including the firebrick as some breakage 

could occur during shipment.

2.  Assemble the feed door pull handle as shown. Install 

thermostat assembly and cover (complete with 

handle) as illustrated.

1

1

2

2

A

A

B

B

3.  Align thermostat control knob with flat on thermostat 

control shaft and press onto shaft.

SET SCREW

4.  Attach feed door locking handle with screws and nuts 

provided. Note: Slotted holes are for adjustment of 

handle. Adjust handle until some pressure is required 

to lock feed door during firing sequence.

5.  Install the thermodisc on rear of furnace cabinet 

with the two screws provided. Mount the conduit 

assembly from the junction box to the thermostat 

bracket. Crimp the two female terminals to each 

of the wire leads. Plug the wires to the thermodisc. 

NOTE: It does not matter which of the two wires 

plugs to which terminal on the thermodisc.

6.  Remove blowers from cartons. Remove junction box 

cover. Attach clip nuts as shown. Install blowers and 

gaskets with 1/4"-20 x 3/4" bolts as shown.

THERMODISC

THERMODISC

COVER

4” ELECTRICAL 

JUNCTION BOX

BLOWERS

BLOWERS GASKET

CLIP NUTS

(Not used in the upper center hole.)

7.  Wire right side blower first (See wiring diagram) and 

replace cover on junction box on blower.

8.  Wire left blower same as above and replace cover.
9.  Check operation of shaker grates with grate handle 

before operating furnace.

ASSEMBLY & INSTALLATION

Содержание HOTBLAST 1500

Страница 1: ...act local building or fire officials about permits restrictions and installation requirements in your area NEVER OPERATE THIS PRODUCT WHILE UNATTENDED CAUTION Please read this entire manual before you...

Страница 2: ...LEL INSTALLATION WITH EXISTING FORCED AIR GAS OR OIL FIRED FURNACE U S ONLY FOR INSTALLATION AS A CENTRAL FURNACE CAUTIONS HOT WHILE IN OPERATION KEEP CHILDREN CLOTHING AND FURNITURE AWAY CONTACT MAY...

Страница 3: ...and_____________________________________________ If no Date of inspection of existing venting system ________________________________________________________________ COMMISSIONING Confirm Hearth Pad I...

Страница 4: ...WHEN ADDING FRESH COAL DANGER RISK OF FIRE OR EXPLOSION DO NOT BURN GARBAGE GASOLINE DRAIN OIL OR OTHER FLAMMABLE LIQUIDS WARNING FIRE HAZARD DO NOT OPERATE WITH FIRE DRAFT EXCEEDING 0 06 W C DO NOT...

Страница 5: ...until some pressure is required to lock feed door during firing sequence 5 Install the thermodisc on rear of furnace cabinet with the two screws provided Mount the conduit assembly from the junction b...

Страница 6: ...k will attach to It uses a standard 16 x 20 x 1 filter NOT INCLUDED to reduce the amount of dust particles from being transferred thru you duct work system DR 6 BAROMETRIC DAMPER REGULATOR In the unli...

Страница 7: ...he central system also comes on The blower will only come on when the temperature in the plenum has reached the setting on the blower control This is to ensure that there is sufficient warm air in the...

Страница 8: ...factors Too much draft may cause excessive temperatures in the appliance Inadequate draft may cause backpuffing into the room and plugging of the chimney Inadequate draft will cause the appliance to...

Страница 9: ...or cement the clay liner in place to the chimney flue liner Method B 9 228 6 mm Clearance to Combustible Wall Member Using a 6 152 4 mm inside diameter listed factory built Solid Pak chimney section...

Страница 10: ...have the same diameter as the furnace outlet If this is not the case we recommend you contact your dealer in order to ensure there will be no problem with the draft The furnace pipe must be made of a...

Страница 11: ...stated on the label on the fuel door c Clearance from combustible materials must comply with those stated on the label on the side of the unit Refer to the clearance table in the front of this manual...

Страница 12: ...12 2021 United States Stove Company CENTRAL INSTALLATION ADD ON INSTALLATION INSTALLATION METHODS OF INSTALLATION...

Страница 13: ...ON B PLENUM COLLECTOR BOX TO EXISTING DUCT WORK WARM AIR EXISTING FURNACE SOLID FUEL FURNACE FILTER BOX COLD AIR RETURN INSTALLATION C PLENUM TOP OPTIONAL TO EXISTING DUCT WORK WARM AIR EXISTING FURNA...

Страница 14: ...LATION F FURNACE PLENUM EXISTING FURNACE SOLID FUEL FURNACE COLD AIR RETURN 2 min CLEARANCE INSTALLATION G SOLID FUEL FURNACE 2 min CLEARANCE COLD AIR RETURN TO FILTER BOX INSTALLATION H SOLID FUEL FU...

Страница 15: ...heater ineffective and cause smoke POWER FAILURE After loss of power remove the filter if provided and do not expect to keep home at normal temperatures ADJUSTING THE BAROMETRIC DRAFT REGULATOR 1 Dril...

Страница 16: ...be used to ventilate the cellar or basement If there is a cleanout opening at the base of the chimney it must be closed tightly 4 If the chimney is operating too cool water will condense in the chimn...

Страница 17: ...and rough handling or abuse When installing your furnace use care in handling Clean with soap and warm water when furnace in not hot DO NOT use any acids or scouring soap as these wear and dull the fi...

Страница 18: ...15 seconds and open door SLOWLY then refuel Check length of flue pipe to chimney Your unit should be within six 6 feet of your chimney Make sure chimney cap is not too close to the top of the chimney...

Страница 19: ...e Burning in this fashion allows heat to drive off the volatile gases and turbulence created increases the burn efficiency There will have to be some experimenting with the individual setup as no two...

Страница 20: ...ere the house does not become too cold It is important that you begin banking early enough before retiring or leaving that you can make necessary adjustments after the fire is well established To revi...

Страница 21: ...2021 United States Stove Company 21 REPAIR PARTS 22 6 8 7 9 20 18 19 17 16 14 10 15 11 12 13 21 1 5 2 3 4 1 28 27 26 29 30 31 24 25 32 33 23 41 39 37 38 40 34...

Страница 22: ...Kep Nut 2 21 68228 Ash Pan 1 22 23398 Flue Baffle 2 23 22761B Flue Collar Ring 1 24 22762B Forced Draft Ring 1 25 86402 1 1 2 Pipe Plug 1 26 80230 Blower 2 27 89319 Gasket Blower 2 28 83340 1 4 20 Cl...

Страница 23: ...75 Thermostat Knob 1 10 23425 Handle Bracket 2 11 89520 Wooden Handle 1 12 86318 Thermostat Chain 1 2 ft 13 68217 Feed Door Assembly Includes Door and Gasket 1 N S 83106S Machine Screw 10 24 x 1 2 SL...

Страница 24: ..._____ Engineer Name _____________________________________ License No _________________________________________ Company ___________________________________________ Telephone No ________________________...

Отзывы: