United CoolAir VFD Скачать руководство пользователя страница 7

Installation, Operation and Maintenance Manual

Field Installed Variable Frequency Drives (VFD’s

7

Subject to change without notice.

120.7-IM (1218)

Field Provided VFD / Field Installed 

(Continued)

8. 

Attach the appropriate size wire to the circuit breaker 

and connect them to the terminals on the VFD marked 

for Mains (L1, L2, & L3) (Refer to Figure 2A or 2B)�

9. 

Attach the appropriate size wire to the circuit breaker 

and connect them to the terminals on the entering 

power block marked for power entering (L1, L2, & L3) 

(Refer to Figure 2A or 2B)�

10. 

Secure all wiring�

11. 

Replace access panel back on the evaporator section�

12. 

Turn on power to unit�

13. 

Program VFD per the manufacturers instructions�

Static Pressure Transducer 

Field or Factory Provided/Field Installed

ELECTRICAL HAZARD

Only  a  qualified  licensed  electrician  or 

other individual that is properly trained in 

handling live electrical components should 

perform any installation, adjustment, 

repair or maintenance� Failure to follow all 

electrical safety precautions and industry 

accepted practices when exposed to 

live electrical components could result in 

death or serious injury�

INFORMATION

Use Copper Conductors Only� Failure 

to use copper conductors may result in 

equipment damage�

The  Static  Pressure  Transducer  (SPT)  is  field  installed 

external to the main electrical panel and wired back to the 

VFD�

1. 

Mount the transducer in a vertical position, making 

sure that the pneumatic tube connections are at the 

bottom� This helps to prevent moisture from reaching 

the transducer�

2. 

Attach field supplied pneumatic tubing to the “HIGH” 

connection of the transducer � (Refer to Figure 3)

3. 

Route the pneumatic tubing to a point approximately 

2/3rds of the distance down the straightest length of 

supply air ducting� Make certain that there are no kinks 

in the tubing� Use clamps to hold the tubing into place�

4. 

Drill a clearance hole into the center face of one side of 

the duct work�

5. 

The end of the pneumatic tubing must be cut square to 

the tube side wall for the tube to pick up the correct air 

pressure reading�

6. 

Insert approximately 1/8” of the tubing into the duct. 

Make sure the tubing is positioned in the duct at a right 

angle so that the air flow goes across the square end of 

the tube�

INFORMATION

Damage to the Static Pressure Transducer 

may occur if not wired correctly�

7. 

Terminals are type sensitive. Power input to the “+” 

terminal must be 10 VDC. Output from the “-” terminal 

is 4  ­  20 mA to the VFD analog input�

8. 

Use 18 AWG wire size to connect from the (­) and (+) 

terminals of the pressure transducer back to the VFD� 

(Refer to Figure 3)

9. 

The terminal markings on the VFD can vary from one 

manufacturer to another� Refer to the VFD manufactur­

er instructions for the proper terminal connections�

10. 

Static Pressure Transducers are typically preset to read 

from O” to 2.5” W.C. The VFD controller will read the 

preset configuration and will accelerate or decelerate 

the motor to maintain the programmed configuration.

Figure 3 - Static Pressure Transducer

Содержание VFD

Страница 1: ...Variable Frequency Drive Field Installation Installation Operation and Maintenance Manual Effective December 2018 Interactive PDF DISCONTINUED For Reference Only ...

Страница 2: ...ION 3 General Information 4 Inspection of Equipment 4 Handling 4 Location 4 Programming 4 Voltage Unbalance 5 Field Provided VFD Field Installed 6 Field Provided VFD Field Installed Continued 7 Static Pressure Transducer 7 Field or Factory Provided Field Installed 7 Field Provided VFD Field Installed Continued 8 Factory Provided VFD Field Installed 9 Field Provided VFD Field Installed Continued 10...

Страница 3: ...which may result in minor or moderate injury if not avoided The information icon indicates a situation that may result in equipment or property damage The information provided alerts the reader to relevant facts and or conditions ELECTRICAL HAZARD WARNING CAUTION INFORMATION This publication includes warnings cautions and information icons that point out safety related issues or conditions as well...

Страница 4: ...ect the VFD to any moisture G Make sure that adequate ventilation is provided as recommended by the VFD manufacturer H Device will not be located near heat radiating elements I Make sure all power wiring and control wiring can be separated per industry accepted practices Programming Refer to the manual with the VFD for programming and troubleshooting instructions INFORMATION Confirm that the incom...

Страница 5: ...m desirable voltage unbalance is 2 0 When testing for voltage unbalance the phase to phase voltages should be measured rather than the phase to neutral voltages since 3 phase motors are connected across phases Use the following formula to determine the percent of voltage unbalance Percent Voltage Unbalance 100 x Maximum Voltage Deviation Average Voltage Example Phase Phase voltages A 8 479V 8 C 47...

Страница 6: ...f the motor side power block to prevent wiring the VFD backwards Refer to Figure 1A or 1B WARNING Severe damage and personal injury may result if jumpers are not removed INFORMATION All field supplied wiring is to be sized per NEC or applicable local codes 6 Attach the appropriate size wire to the power block motor side and connect them to the terminals on the VFD marked for the Motor U V W Refer ...

Страница 7: ...n making sure that the pneumatic tube connections are at the bottom This helps to prevent moisture from reaching the transducer 2 Attach field supplied pneumatic tubing to the HIGH connection of the transducer Refer to Figure 3 3 Route the pneumatic tubing to a point approximately 2 3rds of the distance down the straightest length of supply air ducting Make certain that there are no kinks in the t...

Страница 8: ...nual Field Installed Variable Frequency Drives VFD s 8 Subject to change without notice 120 7 IM 1218 Field Provided VFD Field Installed Continued Figure 2A After VFD Installed Motor w Overload Figure 2B After VFD Installed Motor w o Overload ...

Страница 9: ...motor side power block to prevent wiring the VFD backwards Refer to Figure 3 WARNING Severe damage and personal injury may result if jumpers are not removed 6 Attach the appropriate size wire to the power block motor side and connect them to the terminals on the VFD marked for the motor U V W Refer to Figure 4 INFORMATION Damage to VFD may occur if not correctly wired 7 Attach the appropriate size...

Страница 10: ...nual Field Installed Variable Frequency Drives VFD s 10 Subject to change without notice 120 7 IM 1218 Field Provided VFD Field Installed Continued Figure 4A After VFD Installed Motor w Overload Figure 4B After VFD Installed Motor w o Overload ...

Страница 11: ...Installation Operation and Maintenance Manual Field Installed Variable Frequency Drives VFD s 11 Subject to change without notice 120 7 IM 1218 NOTES ...

Страница 12: ...or All Indoor HVAC Projects Authorized Distributor LIMITED WARRANTY United CoolAir Units are backed by a 1 year limited warranty on parts and a 5 year limited warranty on the compressor labor not included Maintenance items such as filters and belts are excluded under this limited warranty FACTORY TESTED All units are functionally run tested before shipment to ensure a trouble free start up and uni...

Отзывы: