DRAIN CONNECTION

The drain line MUST be trapped because the coil is
located on the negative side of the supply air blower.  It
must also be protected from freezing temperatures.

A 7/8" OD stub connection is provided within the cabi-
net on both ends of the condensate drain pan for either
left hand or right hand piping connections.  Refer to
Figure  6 for recommended drain piping.

The drain line is usually located on the same end of the
coil section as the refrigerant connections.  The line
should be insulated where moisture drippage will be
objectionable or cause damage to the area.  Seal the
unused drain connection with suitable mastic.

 

The 5" dimension must equal or exceed the negative
static pressure developed by the supply air blower.  If it
does not, the condensate will not drain properly and
may overflow the drain pan.  The trap must be at least
2" deep to maintain a water seal under all operating
conditions, especially during blower start up.

REFRIGERANT MAINS

Many service problems can be avoided by taking ade-
quate precautions to provide an internally clean and
dry system and by using procedures and materials that
conform with established standards.

Hard drawn copper tubing should be used where no
appreciable amount to bending around pipes or other
obstructions is necessary.  Use long radius ells wher-
ever possible.  If soft copper is used, care should be
taken to avoid sharp bends, which may cause a restric-
tion.

Fiber glass insulation and a sealing material such as
permagum should be packed around refrigerant lines
where they penetrate a wall to reduce vibration and to
retain some flexibility.

Support all refrigerant lines at minimum intervals with
suitable hangers, brackets or clamps.

Braze all copper to copper joints with Sil-Fos 5 or
equivalent brazing material.  DO NOT use soft solder.

Never braze or solder the liquid and suction lines
together.

The complete suction line should be insulated with no
less than 1/2" ARMAFLEX or equivalent.

If it is desirable to tape or wire the liquid and suction
lines together for support purposes, they must be com-
pletely insulated from each other.

INSTALLING REFRIGERANT MAINS

The units are evacuated and dehydrated at the factory
and shipped with a holding charge of Refrigerant-22.
The suction and liquid connections are sealed with
copper discs.  

Before starting installation of the mains, be sure the
unit has not developed a leak in transit by drilling a
small hole in the sealing discs.  If pressure still exists,
the circuit may be considered leak free.  If pressure
does not exist, the coil should be leak tested and the
necessary repairs should be made.

NOTE: To minimize the possibility of system failure due

to dirt and moisture, a filter-drier must be
installed in each liquid line as close to the
evaporator as possible.  Filter-dryers are not
supplied with the evaporator blowers.  They
are supplied with the matching YORK con-
densing sections.

FIGURE 5: RETURN AIR GRILLE ACCESSORY 

(VERTICAL)

FIGURE 6: RECOMMENDED DRAIN PIPING

5 "

2 "

P L A S T I C

E L L *

S T E E L

S T U B

C O N N E C T I O N

H O S E   C L A M P S

E V A P O R A T O R

C O I L

D R A I N   P A N

* F A C T O R Y   S U P P L I E D

Содержание LA120

Страница 1: ...IONS 4 AGENCY APPROVALS 4 INSPECTION 4 INSTALLATION 6 MAINTENANCE 16 NOTES CAUTIONS AND WARNINGS Installer should pay particular attention to the words NOTE CAUTION and WARNING Notes are intended to c...

Страница 2: ...ION 8 4 SUPPLY AIR PLENUM ACCESSORY 9 5 BASE ACCESSORY VERTICAL ONLY 9 6 RECOMMENDED DRAIN PIPING 10 7 RETURN AIR GRILLE ACCESSORY VERTICAL 10 Fig Pg 8 FIELD WIRING DIAGRAMS FOR POWER SUPPLY 12 9 FIEL...

Страница 3: ...tandard Efficiency 2 Pipe B R 22 Standard Efficiency 4 Pipe 120 Nominal Cooling Capacity MBH 090 7 1 2 Ton 120 10 Ton 150 12 1 2 Ton 180 15 Ton 240 20 Ton C Heat Type C Cooling Only 00 Nominal Heating...

Страница 4: ...on this equipment The forms referenced in this instruction may be ordered from Standard Register 2101 West Tecumseh Road Norman Oklahoma 73069 Toll Free TEL 877 318 7920 Toll Free FAX 877 379 7920 Thi...

Страница 5: ...provided in the filter rack Qty Size in 6 20 X 20 X 1 Face Area Sq Ft 16 7 Operating Charge Refrigerant 22 Lbs Oz 5 8 Weight Lbs Shipping 439 Operating 399 Accessory Weights Lbs Electric Heaters 10 K...

Страница 6: ...e suspended from above as shown in Figure 1 Refer to Form 035 16622 001 for more information on the installation of the suspension accessory and for the individual load on each hanger rod A field adde...

Страница 7: ...illips machine bolts that hold the coil and blower sections together A bolt is located near each corner 3 Move the blower section to the proper location 4 Attach the blower section to the coil section...

Страница 8: ...CCESS OPENING FOR POWER SUPPLY WIRING 1 2 WIRING HARNESS LOCATION This opening in the bottom of the heater control box is used for the wiring harness that connects the heater accessory to the basic un...

Страница 9: ...n and a sealing material such as permagum should be packed around refrigerant lines where they penetrate a wall to reduce vibration and to retain some flexibility Support all refrigerant lines at mini...

Страница 10: ...ith these codes Route the power wires into the unit through one of the 7 8 knockouts in the panel with the supply air opening and connect them to the terminals on blower motor contactor 10M Route the...

Страница 11: ...t is made by moving the blower motor mount ing plate Refer to Figure 7 Turning the adjustment bolt B moves the motor mounting plate up or down Note Never loosen the tow nuts C Two hex nuts A have to b...

Страница 12: ...orator coil may vary greatly measuring the pressure drop across a wet coil under field conditions would be inaccurate To assure a dry coil the refrigerant system should be de activated while the test...

Страница 13: ...Motor Blower HP Blower RPM Adjustable Motor Pulley Fixed Blower Pulley Belt Pitch Dia Inches Bore Inches Pitch Dia Inches Bore Inches Designation Pitch Lg Inches LA120 2 549 716 3 1 4 1 7 8 9 5 1 A55...

Страница 14: ...ing air stream upstream of any heating device Units with steam or hot water coils are the only exception LA120 3000 3500 4000 4500 5000 5500 6000 6500 7000 0 0 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 1 1 1...

Страница 15: ...1 9 1 0 2 1 8 2 5 8 K N O C K O U T F O R 1 5 8 O D S U C T I O N C O N N 3 2 3 8 1 8 7 8 6 5 1 2 5 7 8 B L O W E R S E C T I O N 7 1 4 1 6 1 2 7 8 1 9 3 8 2 1 7 8 6 0 3 4 B L O W E R M O T O R A N D...

Страница 16: ...LUBRICATION The bearings for the blower shaft and the blower motors are permanently lubricated and should not require additional lubricant BELTS Maintain belt tension to extend belt life Replace when...