Wicked Tuna 2P GMP Manual
04/22/2022
14
Name
Cross recessed
hexagon screw set
Spec.
M6×20
Qty
8
Name
Hexagon screw
Spec.
M5×30
Qty
12
Step 9 Locate Control panel fishing rod. Loosen the nut and insert the Rod in. Install the
nut back. Install the other side of rod to the Wiring box.
Step 10 Install L&R fence to the Cabinet. Utilize screw to secure the L&R fence to the
Cabinet.
Step 11 Install Connect plate to the Control panel.
Note: 1.Connect plate with light strip please install on the bottom side.
L&R fence
Connect plate
Connect plate with light strip
Содержание WICKED TUNA 2P GMP
Страница 1: ...IMPORTANT Operation Manual...
Страница 50: ...Wicked Tuna 2P GMP Manual 04 22 2022 49 9 14 Decal Part...
Страница 52: ...Wicked Tuna 2P GMP Manual 04 22 2022 51...