Power Puck Fever GMP Manual
09/27/2022
9
4.3 Play Zone
This machine requires space for playing and for maintenance as shown below.
Leave space around the game upon installation:
Play area: 500 mm/20in
4.4 Machine Installation
Step 1 Prepare 4 stools at least 19.68in (50cm) high, place the table on these 4 stools
same as below picture.
Step 2 Install 4 round acrylics, below is the installation steps.
Your unit must be leveled to operate properly.
NOTICE
5X48 screws
Round acrylic
Light connector
Round acrylic fastener
Light connector
Light connectors should be
connected through the big
round hold on the round acrylic
fastener.
Содержание Power Puck Fever
Страница 1: ...Operation Manual IMPORTANT 110V Version...