Over The Edge Plus GMP(Tickets) Manual
04/21/2023
25
9.5 Ball-Out Motor Replacement Instructions
Step 1 Open Back bottom door. Utilize Phillips screwdriver to loosen screws. Remove Balls
cover plate.
Step 2 Utilize Phillips screwdriver to loosen screws. Remove Balls front plate.
Step 3 Utilize Phillips screwdriver to loosen plastic 4 screws. (Do not remove plastic.)
Step 4 Utilize socket wrench(7mm) to loosen nut and remove Motor assembly. Unplug
connectors.
Balls cover
plate
Screws
Plastic
screws
Balls front
plate
Содержание Over The Edge PLUS
Страница 1: ...IMPORTANT PLUS VERSION Operation Manual...
Страница 38: ...Over The Edge Plus GMP Tickets Manual 04 21 2023 37 10 13 Cabinet Assembly www unistechnologycom...
Страница 42: ...Over The Edge Plus GMP Tickets Manual 04 21 2023 41 10 16 Decals...
Страница 44: ...Over The Edge Plus GMP Tickets Manual 04 21 2023 43...