Jetball Alley 2P GMP(G4K) Manual
07/23/2021
11
Main cabinet
Lane assembly
Baffle plate
Net A
Net B
4.4 Machine Installation
Note: Machine without PC is No.1 machine. Machine with PC is No.2 machine.
No.2 machine need to install on the right side.
Before processing with assembly assure you have the following tools.
No.
Name
Picture
1
Phillips screwdriver
2
Allen wrench
3
Ladder
Kit list:
No.
Name
Size
Qty
Picture
1
Cross recessed pan head screw M4×20 black 28
2
Cross recessed pan head screw M4×35 black 12
3
Cross recessed pan head screw M4×25 black 12
This machine is divided into 6 parts: Main cabinet(2 pcs); Lane assembly(2 pcs); Baffle
frame(4 pcs); Net A(8 pcs); Net B(2 pcs); Marquee assembly(1 pcs); Please contact UNIS
Service in case of any abnormality.
No.2 machine
No.1 machine
Содержание JETBALL ALLEY G4K
Страница 1: ...IMPORTANT Operation Manual G4K Version...
Страница 52: ...Jetball Alley 2P GMP G4K Manual 07 23 2021 51 9 22 Decals...
Страница 54: ...Jetball Alley 2P GMP G4K Manual 07 23 2021 53...