10.Multi-Hold Mode
53
10-3-5. Period Specified Hold (Peak, Valley, P-P)
The hold detection period is specified externally by this method. A reset signal (T/H) is
required for canceling the hold.
Example: Period Specified Peak Hold
t1: Delay time between the instant when the H/M signal is input and the instant when the
hold is detected.
Ts+0.8msec (max.)
t2: Delay time between the instant when the H/M signal is cancelled and the instant when
the hold is determined.
Ts+0.8msec (max.)
t3: Minimum reset signal width required for canceling the hold.
Ts+0.8msec (min.)
t3
t
+
T/H
COMPLETE
t2
t1
H/M
OFF
ON
OFF
ON
OFF
ON
OFF
ON
Determination
Indicated value
Sensor input value
Hold period
Detection
period
High/Low
Limit
Output
Judgment
Содержание f395
Страница 1: ...Operation Manual F395 DYNAMIC FORCE PROCESSOR 10 Apr 2012 Rev 1 12...
Страница 167: ...21 Outer Dimensions 153 21 Outer Dimensions Unit mm 3 3 5 5 Rear Front Side Panel cut dimensions...
Страница 180: ...Unipulse Corporation 9 11 Nihonbashi Hisamatsucho Chuo ku Tokyo 103 0005 Tel 81 3 3639 6120 Fax 81 3 3639 6130...