![Unipart Dorman HD ALT Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/unipart-dorman/hd-alt/hd-alt_operation-and-maintenance-manual_3870075035.webp)
Heavy Duty Assisted Lift Trunnion Operation and Maintenance Manual
Form Reference
C64.65546
Issue
5.00
34 of 39
Issue Date
May 2021
Position Light Signal
Used where a signal has its aspect configuration changed at site and the module is removed.
The plate uses the same mounting screws as the removed module.
Cat Number
Part Number
Description
Contact Unipart
Dorman
B20.19283
iLS PLS Module Blanking Plate
Maintenance Activity
Both the HD ALT and iLS/CLS LITE signals are designed to be maintenance free. However,
Network Rail may mandate some maintenance activity and this will be promulgated through the
normal channels.
There is no provision to carry out any activity with the signal erected. Therefore,
it is to be lowered to the horizontal position using the instructions as shown in this
manual.
Signal Husbandry
If the HD ALT/Signal requires any cleaning activity to be carried out, the only medium approved
is water with the addition of proprietary soap based detergents if required.
Do not use any solvent based or abrasive cleaning material as this may
irreparably damage the signal.