Maintenance
10.2 Maintenance work/Inspection
NOTE
The maintenance work must be carried out in accordance with the inspection and
maintenance schedule! The type and extent of the wear depends on the individual
application and operating conditions. All intervals specified are therefore for
guidance only.
Upon reaching the inspection intervals, this will be shown in the display. Conduct
and document testing. Through menu confirm that validation was done:
MENU
!
COMMANDS
!
Check OK
!
[Enter]
Inspection
Interval
(recommended)
Weekly inspection
Purge gas inlet unobstructed (particularly in
case of frost)
weekly
Exhaust gas line unobstructed (particularly
in case of frost)
weekly
Quarterly inspection
Calibrate device according to manufacturer's
specifications, message in display “Service
[Typ] ZERO”, “Service [Typ] SPAN”,
“Service [Typ] MID”
every 3 months,
latest annually or
when required
Half-yearly inspection
Check integrated filter in the device
every 6 months
Check compressed air supply
1)
(negative
pressure during "drainage")
every 6 months
Check lines for condensate (including all
integrated filters)
every 6 months
Check gas inlets and clean professionally if
necessary
every 6 months
Check fan
every 6 months
Check ejector pump
1)
every 6 months
Check inlet filter (inlet ambient air, filter mat,
ventilator)
every 6 months
Check Peltier cooler
1)
every 6 months
Check fan of Peltier cooler
1)
every 6 months
Yearly inspection
Check air and gas pump
1)
(by performing a
purge gas calibration)
yearly
1)
if installed
52
Содержание INCA4003
Страница 3: ...Dimensions 3 ...
Страница 10: ...EC Declaration of Conformity 10 ...
Страница 20: ...Connections 20 ...
Страница 34: ...Startup switching on 34 ...
Страница 36: ...Description of the workplaces operating elements 36 ...
Страница 48: ...Operation 48 ...
Страница 50: ...Decommissioning switching off 50 ...
Страница 54: ...Maintenance 54 ...
Страница 58: ...Service 58 ...
Страница 60: ...Associated documents 60 ...
Страница 62: ...Disposal 62 ...