background image

Maintenance, Inspection and Test

14

Unihoist Ltd recommend a t horough inspection and test of the Student 150 and lifting

accessories, slings e tc. is carried  out every  six months.  The examination  and test

should be conducted according to the recommendations and procedures below.
Unihoist Ltd recommend maintenance, inspection and certified  testing is carried out by

authorised service dealers only.

Note:

These  recommendations  are  in  compliance  with  the  requirements  of  1998

No.2307 Health and  Safety:The Lifting Operations and Lifting Equipment Regulations

1998. This is a UK regulation. Outside the UK please check your local requirements.

BOOM: 

.t

s

a

m

 

e

h

t

 

o

m

o

o

b

 

e

h

f

o

 

t

n

e

m

h

c

a

t

t

a

 

e

h

k

c

e

h

C

  Make   sure   there is 

only minimal side  movement  of the boom and the boom is   free   to rotate on the

boom bearing.  

.

g

n

it

n

u

o

m

 r

o

t

a

u

t

c

a

 

e

h

k

c

e

h

C

MAST: 

.

e

c

i

v

e

d

 

g

n

i

k

c

o

t

s

a

m

 

e

h

f

o

 

n

o

it

a

r

e

p

o

 

e

h

k

c

e

h

C

  Make   sure   the mast 

.t

e

k

c

o

s

 

e

h

t

 

o

t

n

s

e

g

a

g

n

e

 

y

ll

u

f

  Check the bottom actuator  mounting.

CONTROL & POWER PACK:

Check the lift and function of all plugs and

sockets. Confirm the emergency stop cuts all power to the lift. Check for

Confirm

 .

g

n

i

h

c

t

a

k

c

a

p

 

r

e

w

o

k

c

e

h

.

s

t

c

a

t

n

o

k

c

a

p

 

y

r

e

t

t

a

b

 

e

h

n

o

 

n

o

i

s

o

r

r

o

c

.

g

n

i

k

r

o

w

 

s

g

n

ir

e

w

o

l/

e

s

i

a

r

y

c

n

e

g

r

e

m

e

LEG ADJUSTMENT:

Check the leg linkages are secure and the leg

 

adjustment     handle  is  located   correctly   in the leg adjustment      gate. Operate the

  

leg adjusting  handle  and confirm smooth opening and closing  of the legs.  

LEG PIVOTS:

.y

l

e

e

r

t

o

v

i

p

 

s

g

e

e

h

d

n

a

e

r

u

c

e

e

r

a

 

s

t

o

v

i

p

 

g

e

e

h

k

c

e

h

C

     

.

s

t

o

v

i

p

 

g

e

e

h

n

y

a

l

e

v

is

s

e

c

x

e

 

o

n

 

s

e

r

e

h

e

r

u

e

k

a

M

CASTORS:

.

s

g

e

e

h

t

 

o

t

t

n

e

m

h

c

a

t

t

a

 

m

r

fi

 r

o

s

r

o

t

s

a

c

 ll

a

k

c

e

h

C

  Check for free

rotation of castor  and the wheels.   

.

s

e

k

a

r

b

 

e

h

f

o

 

n

o

it

a

r

e

p

o

 

t

c

e

r

r

o

c

 

e

h

 k

c

e

h

C

Ensure all four castors are in contact with the floor when the Hoist is moved.

ACTUATOR:

Check emergency lowering is operational. The actuator should

require no maintenance other than checking for correct operation and listening

for  unusual    noise and that is correctly secured.

CLEANING:

 

Clean  with ordinary soap and water and/or any hard surface 

disinfectant. Harsh chemical cleaners or abrasives should be avoided as these 

may damage the surface finish of the lift. Avoid wetting any of the electrical parts.

LOAD TEST:

The  load  test  should  be  carried out  in  accordance  with  the

.

s

e

r

u

d

e

c

o

r

p

 

t

s

e

s

r

e

r

u

t

c

a

f

u

n

a

m

  It is strongly recommended  the testing is carried

 

y an authorised service dealer.

b

 t

u

o

CERTIFICATION:

An authorised service     dealer  will  issue         a test certificate after

satisfactory completion of the load test. This certificate will be valid for six months.

SF24  Iss.5  Nov.2011

Содержание Student 150

Страница 1: ...Student 150 Standing Transport Aid User Instruction Manual SF24 Iss 5 Nov 2011...

Страница 2: ...e p O Charging instructions 11 Correctwayto charge the battery 12 Maintenance schedule Daily check list 4 1 3 1 T echnical 15 16 Slings for use with the Unihoist 17 Sling Chart 18 User guide for the S...

Страница 3: ...d o r p s i h t n o k r a M E C e h t h t i w y t i m r o f n o c s e t a r t s n o m e d C E E 2 4 3 9 e v i t c e r i D s e c i v e D l a c i d e M MedicalDeviceDirective 93 42 EEC C E E 6 3 3 9 8 e...

Страница 4: ...Illustration of Unihoist Student 150 3 SF24 Iss 5 Nov 2011...

Страница 5: ...the knee pad as shown on the illustration page 6 6 Remove the screw from the leg opening lever located at the rear of the chassis Fit the leg opening handle through the gate on the mast and push the...

Страница 6: ...on of assembly of mast to base 5 Important The hand control plug is indexed and can only be fitted one way Make sure the plug of the handcontrol is firmly pushed into the socket Do Not Force SF24 Iss...

Страница 7: ...ble Foot Plate 6 To remove the foot plate lift the plate from the hole provided To install it you line up the tabs with the holes on the front of the foot tray and place it on the rubber strips provid...

Страница 8: ...7 9 Plug the actuator jack plug into the left socket actuator socket located at the base of the power pack 10 Push the up and down buttons on the handcontrol and confirm the boom rises and lowers The...

Страница 9: ...e s s i e s u a c e b e r u t a e f y t e f a s r o l o r t n o c a s s a p y b r o t c e n n o c s i d t f i l e h t e t a r e p o o t r e i s a e NEVER e g a m a d r o n i a r t s y l n o l l i w g...

Страница 10: ...Illustration of the Unihoist Student 150 Rear Controls 9 SF24 Iss 5 Nov 2011...

Страница 11: ...of travel in both directions The handcontrol is plugged into a socket at the base of the Controller The handcontrol can be hooked on the mast or boom when not in use 4 Emergency stop The large red em...

Страница 12: ...s e i r e t t a b d e g r a h c s i d h t i w s m e l b o r p d i o v a u o y KEEP e g r a h c n o k c a p r e w o p e h t e c a l P d e g r a h c y l l u f s e i r e t t a b e h t wheneverit isnot in...

Страница 13: ...Correct way to charge the battery 12 SF24 Iss 5 Nov 2011...

Страница 14: ...ng the lift MAKE sure the Lift moves freely on its castors MAKE sure the legs open andclose correctly OPERATE the handcontrol or hydraulic unit to confirm the boom raises and lowers satisfactorily CON...

Страница 15: ...e s i a r y c n e g r e m e LEG ADJUSTMENT Check the leg linkages are secure and the leg adjustmenthandle islocated correctly inthelegadjustment gate Operate the legadjusting handle andconfirmsmootho...

Страница 16: ...idth 670mm LegsOpen Internal Width 552mm Overall Height of Legs 112mm Ground Clearance 43mm Front Twin Castors 100mm Rear Braked Castors 100mm Weights Mast Boom Assembly 19 5kgs BaseAssembly 24kgs Ele...

Страница 17: ...16 Technical Specification B1 B B D A A1 c M odel Student 150 A 102 0 A 1 16 4 0 B 6 8 2 B 4 9 0 B 1 106 8 C 9 6 5 D 110 DIMENSIONS MM SF24 Iss 5 Nov 2011...

Страница 18: ...e l e s n e h W e h t n i t s i s s a l l i w s e d i u g g n i w o l l o f e h T d e t f i l e b o t t n e i t a p e h t r o f g n i l s f o e p y t e h t correctselection DONOT use any other manufa...

Страница 19: ...370 F 1250 1360 In mm Extended full length Order Code Medium Polyester EF182 Large Polyester EF183 A F C B D E Standing Sling A B D C Med Large A 1040 1100 B 750 800 C 280 280 D 1270 1360 In mm Extend...

Страница 20: ...e t a C r i a h C r e w o h S t e l i o T B y r o g e t a C The Standing and Transport slings are suitable for persons in the SITTING positiononly Illustrations of Slings TheStandingand Transport slin...

Страница 21: ...hat the cl ient s arms are outsideof the sling Fig 2 Position Student so that the client s feet in the foot tray and kneesrest against the knee pad Initially attach the longer loops of the sling to th...

Страница 22: ...ent s armsare outside of the sling Fig 5 Raise the cleint s leg and feed the leg strap under and up between the legs d e s a e r c r o d e t s i w t t o n s i g n i l s e h t e r u s n E r o f e r u d...

Страница 23: ...u l o s p a o s d l i m a n i h s a W DONOT usebiological detergents DONOT bleach in awarm room or in the openair DONOT placeon convector heaters or steam pipes DONOT dry in tumble dryers which excee...

Страница 24: ...orrectly t e s d n a h e g n a h C 4 r e e n i g n E e c i v r e S l l a C 5 6 Unplugcharger k c e h c d n a y r e t t a b t a e s e R 7 latch is engaged y r e t t a b e g r a h C 1 r e e n i g n E e...

Страница 25: ...l a e d d e s i r o h t u a n a y b d e n o i s s i m m o c f i e s a h c r u p e r u t u f r o f m e h t y b d e t r o p p u s e r a d n a r e l a e d r u o y y b d e n o i s s i m m o c e r a s t c...

Страница 26: ...ax 01865 883434 Email unihoistltd btconnect com SF24 Iss 5 Nov 2011 2009 by Unihoist Ltd All rights reserved No part of this document may be reproduced or transmitted in any form or by any means elect...

Отзывы: