C.I.B. UNIGAS
- M03993CH
22
Pilot gas train
The connection to the pilot gas train must be done according to the following scheme.
Fig. 15
Key
1
Gas solenoid valve
2
Gas pressure switch
3
Pressure governor with filter
4
Bellows unit
5
Manual cutoff valve
6
Pressure governor
7
Tank
Gas supply:
LPG
The pilot gas train is already installed into the burner, the connection from the pressure governor with filter to the gas supply network
must be carried out.
Once the gas train in installed, execute the electrical connections for all its items (gas valves group, pressure switch).
ATTENTION:
once the gas train is mounted according to the diagram on Fig. 15, the gas proving test must be performed,
according to the procedure set by the laws in force.
1
2
4
5
3
1
6
7
BURNER MANUFACTURER
INSTALLER
L.P.G.
connection to the gas
supply network
Содержание PBY510
Страница 18: ...C I B UNIGAS M03993CH 18 HYDRAULIC DIAGRAMS Fig 13 Hydraulic diagram 3ID0024 ...
Страница 20: ...C I B UNIGAS M03993CH 20 Fig 14 Hydraulic diagram 3I2D01 ...
Страница 41: ...C I B UNIGAS M03993CH 41 ...
Страница 43: ...C I B UNIGAS M03993CH 43 ...