PART II: INSTALLATION
20
GAS TRAIN CONNECTIONS
The diagrams show the components of the gas trai included in the delivery and which must be fitted by the installer.The diagrams are in
compliance with the current laws.
Gas train with valves group VGD and MBE with built-in gas pressure go gas leakage pressure switch (PGCP)
Legend
1 Filter
6 Butterfly valve
2 Pressure switch - PGMIN
7 Pressure transducer
3 Safety valve with built in gas governor
8 Main burner
4 Proving system pressure switch - PGCP
9 Antivibration joint (*optional)
5 Pressure switch PGMAX: mandatory for MBE, optional for VGD and MB-DLE
10 Manual valve(*optional)
M
PS
PSL
PSH
PT
7
MBE
1
9
10
M
PS
PSL
PSH
VGD
1
9
10
GAS INLET
GAS INLET
SUPPLIED BY BURNER CONSTRUCTOR
BY OTHERS
Содержание P91A
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 57: ...LME73 000Ax PME73 831AxBC LME73 831AxBC Service instruction manual M12921CB Rel 1 2 02 2016...
Страница 79: ...23...
Страница 80: ...Note Specifications and data subject to change Errors and omissions excepted...
Страница 81: ......
Страница 82: ......
Страница 83: ......
Страница 84: ......
Страница 85: ......
Страница 86: ...GEFRAN 1600V 15 18 16 19 21 20 12 13 4 5 9 3 2 1...
Страница 87: ......
Страница 88: ......
Страница 89: ......
Страница 90: ......
Страница 91: ......
Страница 92: ......
Страница 93: ...IM...
Страница 94: ......
Страница 95: ......
Страница 96: ......
Страница 97: ......
Страница 98: ......
Страница 99: ......
Страница 100: ......
Страница 101: ......
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......