background image

3

3b) FIRING WITH GAS, LIGHT OIL OR OTHER FUELS
GENERAL

The burner shall be installed by qualified personnel and in compliance

with regulations and provisions in force; wrong installation can cause
injuries to people and animals, or damage to property, for which the
manufacturer cannot be held liable.

Before installation, it is recommended that all the fuel supply system

pipes be carefully cleaned inside, to remove foreign matter that might
impair the burner operation.

Before the burner is commissioned, qualified personnel should inspect

the following:

a the fuel supply system, for proper sealing;
b the fuel flow rate, to make sure that it has been set based on the firing

rate required of the burner;

c the burner firing system, to make sure that it is supplied for the desig-

ned fuel type;

d the fuel supply pressure, to make sure that it is included in the range

shown on the rating plate;

e the fuel supply system, to make sure that the system dimensions are

adequate to the burner firing rate, and that the system is equipped with
all the safety and control devices required by the regulations in force.

When the burner is to remain idle for some time, the fuel supply tap or

taps should be closed.

SPECIAL INSTRUCTIONS FOR USING GAS

Have qualified personnel inspect the installation to ensure that:
a the gas delivery line and train are in compliance with the regulations

and provisions in force;

b all gas connections are tight;
c the boiler room ventilation openings are such that they ensure the air

supply flow required by the current regulations, and in any case are
sufficient for proper combustion.

Do not use gas pipes to earth electrical equipment.

Never leave the burner connected when not in use. Always shut the

gas valve off.

In case of prolonged absence of the user, the main gas delivery valve

to the burner should be shut off.

Precautions if you can smell gas

a do not operate electric switches, the telephone, or any other item likely

to generate sparks;

b immediately open doors and windows to create an air flow to purge the

room;

c close the gas valves;
d contact qualified personnel.

Do not obstruct the ventilation openings of the room where gas

appliances are installed, to avoid dangerous conditions such as the
development of toxic or explosive mixtures.

DIRECTIVES AND  STANDARDS

Gas burners

European  directives

-Regulation 2016/426/UE (appliances burning gaseous fuels)
-2014/35/UE (Low Tension Directive)
-2014/30/UE (Electromagnetic compatibility Directive)
-2006/42/EC  (Machinery Directive)

Harmonized standards

-UNI EN 676 (Automatic forced draught burners for gaseous fuels)
-EN 55014-1 (Electromagnetic compatibility- Requirements for house

hold appliances, electric tools and similar apparatus)

-EN 60204-1:2006 (Safety of machinery – Electrical equipment of

machines.)

-CEI EN 60335-1 (Specification for safety of household and similar

electrical appliances);

-CEI EN 60335-2-102 (Household  and  similar electrical appliances.

Safety. Particular requirements for gas, oil and solid-fuel burning
appliances having electrical connections).

-UNI EN ISO 12100:2010 (Safety of machinery - General principles for

design  - Risk assessment and risk reduction);

Light oil burners

European  directives

-2014/35/UE (Low Tension Directive)
-2014/30/UE (Electromagnetic compatibility Directive)
-2006/42/EC  (Machinery Directive)

Harmonized standards

-UNI EN 267-2011(Automatic forced draught burners for liquid fuels)
-EN 55014-1 (Electromagnetic compatibility- Requirements for house

 

hold appliances, electric tools and similar apparatus)
-EN 60204-1:2006 (Safety of machinery – Electrical equipment of

 

machines.)
-CEI EN 60335-1 (Specification for safety of household and similar

 

electrical appliances);
-CEI EN 60335-2-102 (Household  and similar electrical appliances.

 

Safety. Particular requirements for gas, oil and solid-fuel burning

 

appliances having electrical connections).
-UNI EN ISO 12100:2010 (Safety of machinery - General principles for

 

design  - Risk assessment and risk reduction);

Heavy oil burners

European  Directives

-2014/35/UE (Low Tension Directive)
-2014/30/UE (Electromagnetic compatibility Directive)
-2006/42/EC  (Machinery Directive)

Harmonized standards

-UNI EN 267(Automatic forced draught burners for liquid fuels)
-EN 55014-1 (Electromagnetic compatibility- Requirements for house

 

hold appliances, electric tools and similar apparatus)
-EN 60204-1:2006 (Safety of machinery – Electrical equipment of

 

machines.)
-CEI EN 60335-1 (Specification for safety of household and similar

 

electrical appliances);
-CEI EN 60335-2-102 (Household  and similar electrical appliances.

 

Safety. Particular requirements for gas, oil and solid-fuel burning

 

appliances having electrical connections).
-UNI EN ISO 12100:2010 (Safety of machinery - General principles for

 

design  - Risk assessment and risk reduction);

Содержание LMV5 Series

Страница 1: ...CC 0 1 10 2020 BURNERS BRUCIATORI BRULERS BRENNER QUEMADORES Microprocessor controlled MANUAL OF INSTALLATION USE MAINTENANCE LMV5x Gas Light oil burners HRX512 FGR HRX515 FGR HRX520 FGR HRX92R FGR HR...

Страница 2: ...e employed exclusively for the use for which it was designed Before connecting the burner make sure that the unit rating is the same as delivery mains electricity gas oil or other fuel Observe caution...

Страница 3: ...ixtures DIRECTIVES AND STANDARDS Gas burners European directives Regulation 2016 426 UE appliances burning gaseous fuels 2014 35 UE Low Tension Directive 2014 30 UE Electromagnetic compatibility Direc...

Страница 4: ...quipment of machi nes EN 60335 2 Electrical equipment of non electric appliances for house hold and similar purposes Safety requirements Burner data plate For the following information please refer to...

Страница 5: ...proving system 8 2 gas valves gas proving system maximum gas pressure switch 8 GAS CONNECTION 50 Rp2 65 DN65 80 DN80 100 DN100 9 Low NOx EF Medium large burners complete with electronic cam and temper...

Страница 6: ...gas net calorific value Hi 34 02 MJ Stm3 Note2 Maximum gas pressure 500mbar with Siemens VGD or Dungs MultiBloc MBE Minimum gas pressure see gas curves Note3 Burners are suitable only for indoor oper...

Страница 7: ...40 560 M14 552 390 390 390 791 149 642 942 353 830 330 270 524 62 554 195 225 603 9 151 HRX515 FGR 50 1685 222 928 371 35 333 595 100 530 522 1155 532 1549 946 515 360 400 494 540 560 M14 552 390 390...

Страница 8: ...424 280 310 300 790 148 642 942 353 649 228 185 478 55 481 170 200 549 9 131 HRX92 FGR 50 1410 1520 135 831 35 550 100 420 530 493 978 506 1274 725 439 286 316 228 450 360 464 M12 424 280 310 300 532...

Страница 9: ...ing to the installed gas train DN65 in the example From the interception point draw an horizontal line as far as matching on the y axis the value of pressure necessary to get the requested furnace inp...

Страница 10: ...um output point is usually reached by adjsuting the combustion head to its MAX position see paragraph Adjusting the combustion head the minimum output point is reached setting the combustion head to i...

Страница 11: ...R MG Stm3 h GAS PRESSURE mbar RX520 FGR MG Stm3 h ATTENTION the gas rate value is quoted on the x axis the related network pressure is quoted on the y axis pressure value in the combustion chamber is...

Страница 12: ...from the boiler s Technical specifications Measuring gas pressure in the combustion head In order to measure the pressure in the combustion head insert the pressure gauge probes one into the combusti...

Страница 13: ...on head curves natural gas Curves are referred to pressure 0 mbar in the combustion chamber GAS PRESSURE mbar HRX92R FGR MG Stm3 h HRX92 FGR MG Stm3 h GAS PRESSURE mbar HRX512 FGR MG Stm3 h HRX515 FGR...

Страница 14: ...ube and the refractory lining is sealed with appropriate insulating material ceramic fibre cord or refractory cement Packing The burners are despatched in wooden crates whose dimensions are HRX5xx ser...

Страница 15: ...the pressure in combustion chamber are included in the burner performance curve otherwise the choice of the burner must be revised consulting the burner manufacturer To choose the blast tube lenght co...

Страница 16: ...lant designed according to the following guidelines size the FGR pipe as per the example below ATTENTION Pipe elbows increase pressure losses so limit their use as much as possible Flue gas temperatur...

Страница 17: ...y tightened To mount the gas train proceed as follows NOTE the bellows unit the manual cutoff valve and the gaskets are not part of the standard supply WARNING before executing the connections to the...

Страница 18: ...gas proving test mus be performed according to the procedure set by the laws in force ATTENTION it is recommended to mount filter and gas valves to avoid that extraneous material drops inside the val...

Страница 19: ...8xM8x30 in accordance with section 8 4 Screws 4xM5x25 for VD assembly are supplied 5 After installation perform leakage and functional test 6 Disassembly in reverse order 1 Insert studs A 2 Insert se...

Страница 20: ...er according to UL 353 and ANSI Z21 18 CSA 6 3 No venting required in loca tions where vent limiters are accepted by the jurisdiction 4 Only PS pressure sensors specified by DUNGS are authorised to be...

Страница 21: ...alled upstream from all the control and on off devices Once the train is installed connect the gas valves group and pressure switches plugs Caution the SKP2 diaphragm D must be vertical WARNING removi...

Страница 22: ...r a preset time test time td1 The pressure switch PGCP has not to detect a rise of pressure Test space filling EV1 opens and keep this position for a preset time td3 in order to fill the test space Te...

Страница 23: ...IRCUIT From tank To tank The burner is supplied with filter and flexible hoses all the parts upstream the filter and downstream the return flexible hose must be installed by the customer As far as the...

Страница 24: ...es time to deposit on the bottom of the tank thus avoiding the possibility that they might be sucked into the pump On initial commissioning a dry operation is foreseen for a considerable length of tim...

Страница 25: ...provided 1 remove the closing nuts A and R on the inlet and return connections of the pump 2 screw the rotating nut of the two flexible hoses on the pump being careful to avoid exchanging the lines se...

Страница 26: ...lock nut 4 To increase pressure twist adjusting screw 3 clockwise To decrease the pressure twist screw counterclockwise Tight the lock nut 4 refit the gasket 2 and the cap nut 1 Key 1 Cap nut 2 Gaske...

Страница 27: ...the connection functionality and compliance with the health and safety principles of the earth cable If in doubt ask for an accurate inspection by qualified technical engineers Check the connection to...

Страница 28: ...E MACHINE EXCEPT FOR ITS MAINTENANCE TO SECURE THE MACHINE ACT ON THE ISOLATOR SWITCH IN CASE OF ANOMALIES THAT REQUIRED A SHUT DOWN OF THE BURNER IT S POSSIBLE TO ACT ON THE AUXILIARY LINE SWITCH LOC...

Страница 29: ...maximum air rate the control box drives the actuator opening and when the maximum opening position is reached the pre purge time counting starts At the end of the pre purge time the actuator is in the...

Страница 30: ...ater or other fluids in the generator 4 Check that the ventilation gates dampers in the plant are open and the stack is free 5 Connect the gauges used to adjust and check pressures on the incoming lin...

Страница 31: ...the LMV control box starts the system test cycle the AZL display shows the System Test message at the end of the test it shows the main page and the system stops the safety chain is open waiting for t...

Страница 32: ...lts occuring it represents the lockout reset function Fault History by selecting this item and pressing the ENTER key the Lockout History will be showed about the last 21 faults occured Lockout Histor...

Страница 33: ...rrow keys select Params Display press ENTER the system will ask you to enter the proper password by means of the arrow keys select Access w out pass access without password user level confirm by press...

Страница 34: ...the 2 position controller To set these values select the item SD_ModOn SDOn by scrolling down the Load controller menu with the arrow keys and press ENTER the display will show The deafult value for...

Страница 35: ...ime Wintertime mode desired and cofirm by pressing ENTER press ESC to exit Set the time zone Time EU US in the same way Languages it allows setting the current language choose the desired language and...

Страница 36: ...rner starts upthe Thermal shock protection activated message will be showed If this function is not enabled after startup the burner will rapidly increase the load according to the requested value and...

Страница 37: ...en the burner does not follow the modulator and probe settings but operates at the set load For further details see the LMV5x annexed manuals SetLoad Autom Manual Off Autom Manual Off Curr Automatic N...

Страница 38: ...nts do not exceed a value that creates a hazardous condition to the burner Adjusting output pressure for positive pressure systems requires PS 10 40 or PS 50 200 Outlet pressure MIN 10 25 50 75 MAX PS...

Страница 39: ...ed To calibrate the maximum pressure switch proceed as follows according to its mounting position remove the pressure switch plastic cover if the maximum pressure switch is mounted upstreaam the gas v...

Страница 40: ...ENSIONS FLOW RATE kg h Indicative pessure on return bar Min Max 40 13 40 19 50 16 50 22 60 20 60 20 70 23 70 23 80 26 80 23 90 30 90 22 100 33 100 22 115 38 115 21 130 43 130 22 145 48 145 21 160 53 1...

Страница 41: ...PART III OPERATION 41 FLUIDICS KW3 60 NOZZLE SUPPLY PRESSURE 20 bar VISCOSITY AT NOZZLE 5 cSt Pressure on return bar Flow rate kh h The nominal size of the nozzle is indicated at the ends of the curve...

Страница 42: ...ESSURE 20 bar VISCOSITY AT NOZZLE 5 cSt Pressure on return bar Flow rate kh h Pressure on return bar Flow rate kh h The nominal size of the nozzle is indicated at the ends of the curve The nominal siz...

Страница 43: ...eturn bar Flow rate kh h The nominal size of the nozzle is indicated at the ends of the curve Pressure on return bar Flow rate kh h The nominal size of the nozzle is indicated at the ends of the curve...

Страница 44: ...o curve see the LMV related manual 5 Only if necessary adjust the supply pressure as follows see related paragraph insert a pressure gauge into the port shown on Fig 17 and act on on the pump adjustin...

Страница 45: ...ded to verify that the combustion parameters are within the range of acceptable values even against a pressure varia tion that gets close to the limit of the pressure switch This check should be carri...

Страница 46: ...e knob VRT Fasten VB screw when the adjustment is accomplished The diffuser position must be set during the commissioning according to the regulation needs The diffuser position is factory set as show...

Страница 47: ...if necesssary Remove and clean the combustion head Examine and clean the ignition electrodes adjust and replace them if necessary Examine and clean the detection electrode photoelement according to t...

Страница 48: ...he top H 2 Remove the UV detector out of its housing disconnect electrode cables and the light oil flexible hoses 3 Loosen the screws V holding the gas manifold G loosen the connectors E 4 Some models...

Страница 49: ...unscrew the VE fixing screws and remove them place the new electrodes being careful to observe the measures showed on pag reassemlbe following the reversed procedure Caution adjust the nozzle position...

Страница 50: ...etector QRI Seasonal stop To stop the burner in the seasonal stop proceed as follows 1 turn the burner main switch to 0 Off position 2 disconnect the power mains 3 close the fuel valve of the supply l...

Страница 51: ...ssure switch damaged or bad links Check air pressure switch functions and links Burner control damaged Replace burner control BURNER LOCKS OUT WITHOUT ANY GAS FLOW Gas valves don t open Check voltage...

Страница 52: ...of cables in the ignition transformer or into the electrodes Improve the installation Ignition transformer damaged Replace the transformer PUMP TOO NOISY Suction too high over 0 35 bar dirty filters...

Страница 53: ......

Страница 54: ......

Страница 55: ......

Страница 56: ...a L Galvani 9 35011 Campodarsego PD ITALY Tel 39 049 9200944 Fax 39 049 9200945 9201269 web site www cibunigas it e mail cibunigas cibunigas it Note specifications and data subject to change Errors an...

Страница 57: ...Siemens LMV5x Service Manual M12920CC rev 2 1 08 2017...

Страница 58: ...harmful Before any cleaning or servicing operation disconnect the unit from the mains by turning the master switch OFF and or through the cut out devices that are provided Make sure that inlet or exh...

Страница 59: ...2 Configuration of a pressure or a temperature probe type at X61 door 20 6 2 1 Configuration of a pressure or a temperature probe signal at X61 door 20 6 3 Configuration of the X62 door input signal...

Страница 60: ...must be connected to earth PE Volt must be 0 V between N PE NOTE PE protection earth it is not FE FE functional earth 1 1 2 Protective Earth PE and Functional Earth FE Protective Earth PE Known as an...

Страница 61: ...les and to the burner housing e g use a electrical insulating conduit or distance parts e g plastic material see also Appendix Example for wiring earthing and shielding the LMV5 System Prefer a double...

Страница 62: ...lso Appendix Example for wiring earthing and shielding the LMV5 System 1 3 2 Shielding The LMV5 FE terminals for the shields are LMV5 internally connected with X52 4 this terminal must be connect exte...

Страница 63: ...ables for the Load controller Temperature or Pressure sensor set point load output at the LMV5 X60 X61 X62 X63 Together in cable duct 2 for Line voltage e g Cable for Ignition transformer Cables for o...

Страница 64: ...8...

Страница 65: ...9 1 4 1 Servomotor wiring example 1 4 2 Bus cable wiring on LMV5x and AZL doors 1 4 3 EARTH connection example...

Страница 66: ...urner will immediately turns off keys socket The user interface is made of display it shows menus and parameters ESC key previous level it goes back to the previous level menu or exits the programming...

Страница 67: ...ition position phase 38 The burner remains in that position because this is the only one work point in memory The fuel air ratio curve must be set until the maximum load limit 100 output During the se...

Страница 68: ...12 2 2 LMV5x program structure...

Страница 69: ...ED TO NOT USE O2 MONITORING IF FGR IS INSTALLED AND ACTIVE 2 3 Burner ID number The burner ID number corresponds to the burner serial number NOTE in case of call to the Service Center always tell the...

Страница 70: ...rmed by pressing Enter Display before the first password character is entered Enter Password The example displays when entering the third password character Enter Password S If the check of the passwo...

Страница 71: ...nals 318 and 319 of the burner supply terminal block see below the system will lead to an immediate burner lockout In case of burner designed with automatic pull out system from the generator the burn...

Страница 72: ...address an actuator choose the corresponding actuator and follow the instructions on display When the actuator green LED flashes it means that one of the following function is set according to the nu...

Страница 73: ...o according to the next procedure By following the next table set both parameter OperatRampMod and TimeNoFlame to set the ramp up stop times for the VSD and the actuator opening speed from 0 to 90 Fol...

Страница 74: ...al output from the LMV to the client DCS or PLC Output Value Selection are Load Load 0 O2 Pos Air Pos Fuel Pos Aux1 Pos Aux2 Pos Aux3 Speed VSD Flame Temp Pt1000 TempNi1000 Temp Pt100 Temp X61 Press X...

Страница 75: ...level 5th level 6th level Description Params Display Menu level for making the parameter set tings LoadController Settings for the internal load controller Configuration General configuration of the l...

Страница 76: ...ens End of pressure measuring range for input X61 0 99 9 bar 0 2000 C 0 99 9 bar 0 2000 C Set the probe value Example if a max 10bar Siemens sensor is used the voltage output signal will be 0 V at 0 b...

Страница 77: ...6th level Description Params Display Menu level for making the t Params Display SD ModOn General configuration of the load SD ModOn SD ModOff General configuration of SD ModOff the display will show T...

Страница 78: ...for internal load controller StandardParam Adaption very fast fast normal slow very slow It is possible to manually set the PID parameters to any value in the setting range shown below to activate a...

Страница 79: ...100 Ni1000 or Pt 1000 temperature sensor is connected to X60 3 and X60 4 terminals ATTENTION basically these parameters provide a function similar to the safety thermostat one but can not replace it T...

Страница 80: ...of the menu by means the Esc 1st level 2nd level 3rd level 4th level 5th level Range Description Params Display Menu level for making the parameter settings VSD Module Settings for the VSD module Conf...

Страница 81: ...ogramming levels of the menu by means the Esc 1st level 2nd level 3rd level 4th level 5th level 6th level Description Params Display Menu level for making the para meter set tings RatioControl GasSett...

Страница 82: ...corresponding to a hypothetic low flame stage Note points P1 and P2 are temporally mentioned 10 and 100 load independently from the actual load The operator can name the load on each point without re...

Страница 83: ...of oil ATTENTION as for increasing by few degrees it means that the increasing must be performed in order to avoid great excess of air or defect of air Therefore the increasing operation must be perfo...

Страница 84: ...ir actuator Do not exit by pressing Esc from the values column because data will not be stored Press arrows to select another actuator to be set for example press to choose Fuel Press keys to change t...

Страница 85: ...the other points So it is necessary to check the adjustment of the points already set ATTENTION for proper operation it is necessary that the curve of each actuator does not reverse its slope ATTENTI...

Страница 86: ...cts are the following 1 Pressures have reciprocal effects 2 The reduction of O2 can lead to a significant increase of NOx levels As a result of these reciprocal effects it is difficult if not impossib...

Страница 87: ...ngs for firing on Gas or on Oil AirActuator GasActuat OilActuat AuxActuator AuxActuator 2 AuxActuator 3 AuxActuator 3 AuxActuator 3 MUST be chosen After the addressing activate the FGR servomotor 1st...

Страница 88: ...Open 10 4 Setting the load controller mode see the previous chapter regolazione senza FGR WARNING If one of the intLC internal Load Controller option must be choice a temperature sensor cannot be con...

Страница 89: ...ulation temperature Auxiliary actuator 3 maintains the ignition position until an adjustable temperature is reached parameter FRG On Temp During the operation the burner regulate its load as per the s...

Страница 90: ...inimum amount of flue gas The position is also used to ensure a defined damper position for emergency operation or automatically deactivated flue gas recirculation FGR FGR MaxPos Fact Maximum limitati...

Страница 91: ...on FGR factor of 50 leads to a 50 reduction of the damper positions If the temperature value of the smoke during the operation of the burner is higher than the temperature value during the commissioni...

Страница 92: ...StageLoad 0 100 15 StageSetp_M od 1 100 Wcurrent 5 Stage Setp_Stage 1 100 Wcurrent 5 MaxTme Mod 1 63 min 3 min MaxTmeStage 1 63 min 3 min Cold start thermal shock protection maximum time per step mult...

Страница 93: ...tion this function can be set at user level also see chapter manual operation the CSTP function is momentary excluded when enabling the automatic operation again the CSTP function previously set at Se...

Страница 94: ...assword Description ManualOpe ration Menu level for activating manual operation with the preselected load Au tom Manual Off Selection of manual or automatic operation Automatic Burner on Burner off Us...

Страница 95: ...39...

Страница 96: ...V 10 15 50 60 Hz Imax 5 A PIN3 x Protective earth PE PIN4 x Supply voltage neutral conductor N PIN5 x Supply voltage live conductor L AC 230 V 10 15 50 60 Hz fuse 6 3 AT DIN EN 60 127 2 5 X4 01 Fuel s...

Страница 97: ...5 mA PIN2 x Controller closes stage 3 AC 230 V 10 15 50 60 Hz Imax 1 5 mA PIN3 x Controller opens stage 2 AC 230 V 10 15 50 60 Hz Imax 1 5 mA PIN4 x Power signal for control of con troller AC 230 V 10...

Страница 98: ...ductor N PIN3 Fuel valve 2 oil AC 230 V 10 15 50 60 Hz 1 A cos 0 4 X7 02 PIN1 x Protective earth PE PIN2 x Neutral conductor N PIN3 Fuel valve 3 oil AC 230 V 10 15 50 60 Hz 1 A cos 0 4 X7 03 PIN1 x Pr...

Страница 99: ...oil AC 230 V 10 15 50 60 Hz 1 A cos 0 4 X9 01 PIN4 x Fuel valve 1 gas AC 230 V 10 15 50 60 Hz 2 A cos 0 4 PIN3 x Fuel valve 2 gas AC 230 V 10 15 50 60 Hz 2 A cos 0 4 PIN2 x Fuel valve gas AC 230 V 10...

Страница 100: ...vely QRA2 QRA4 U QRA10 refer to section Description of inputs and out puts Umax X3 04 PINS Imax 0 5 mA X50 PIN6 x Reference ground PELV PIN5 x Communication signal CANL DC U 5 V Rw 120 level to ISO D...

Страница 101: ...mperature sensor input PT100 X61 PIN5 x Functional earth for shield connec tion PIN4 x Reference ground PIN3 x Current input for temperature pressure signal 0 4 20 mA DC 0 4 20 mA PIN2 x Voltage input...

Страница 102: ......

Страница 103: ......

Страница 104: ...Note Specifications and data subject to change Errors and omissions excepted...

Страница 105: ...d an earth external wire for the motor ground The cable for the 4 20mA signal that controls the VSD must be shielded only LMV5x side ends connected to the equipotential terminal If the VSD is not insi...

Страница 106: ...Annex1 Example for motor cable...

Страница 107: ......

Страница 108: ...Annex 2 Example for sensor cable...

Страница 109: ......

Страница 110: ......

Страница 111: ...E Power supply Line voltage Gas L1 High Voltage Transformer N M Power supply Line voltage FE X73 Speed sensor VSD Fan Motor Separate conduit shielded line voltage cable X70 X10 02 X9 01 X4 02 Separate...

Страница 112: ...ion and current fuel throughput The LMV52 system uses an O2 sensor QGO20 an external O2 module and the standard components of the LMV51 sys tem The PLL O2 module is a detached measuring module for the...

Страница 113: ...defined system cables AGG5 641 and AGG5 631 result from the points of intersection in the graph 50 48 46 44 42 40 38 36 34 32 30 28 26 24 22 20 18 16 14 12 10 8 6 4 2 0 0 5 1 25 2 3 5 7 8 AGG5 631 AG...

Страница 114: ......

Страница 115: ...CAN bus cable 100 m Whenever the distance between the LMV5 and the last actuator exceeds 20 m or if more than one SQM48 is used on the burner refer to sizing chart Determination of maximum cable leng...

Страница 116: ...N F T4 AC2 12 V 5 5 3 Not used M L Power trafo 2 AGG5 2 No bus termination No bus termination Bus termination 5 5 5 5 No bus termination No bus termination Installation in the control panel actuator...

Страница 117: ...owered by a sec ond transformer to be located near the actuators and the O2 module Connect the power supply line from that transformer to the O2 module PLL52 in ex ample 3a SA6 in example 3b Auxiliary...

Страница 118: ...n facility 18 8 1 Inputs and outputs Mounting panel shielding connection Communication and power supply for LMV52 Mounting panel shielding connection Communication and power supply Temperature sensor...

Страница 119: ...l o w e d t o j o i n t h e f l u e g a s e s o n t h e i r w a y f r o m t h e b u r n e r t o t h e d e t e c t o r D F l o w v e l o c i t y 1 1 0 m s F l u e g a s t e m p e r a t u r e a t t h e...

Страница 120: ...e p o u r B 1 B 2 B 2 T e n s i o n d e t h e r m o c o u p l e M U 3 S i g n a l d e l l m e n t d e c p m p e n s a t i o n d e t e m p r a t u r e G 2 A l i m e n t a t i o n d e l l m e n t d e c...

Страница 121: ...k s i t i s r e c o m m e n d e d t o l e a v e t h e m e a s u r i n g s y s t e m Q G O a n d R P O s w i t c h e d o n D u r i n g t h e h e a t i n g u p p h a s e t h e d e t e c t o r c o u l d...

Страница 122: ...A G O 2 0 0 0 2 A A R a u c h g a s e i n t r i t t B R a u c h g a s a u s t r i t t C K e r b e D F l a c h d i c h t u n g b e i l i e g e n d L 1 8 0 m m f o r A G O 2 0 0 0 1 A L 2 6 0 m m f o r...

Страница 123: ...r h Transport DIN EN 60 721 3 2 Climatic conditions class 2K2 Mechanical conditions class 2M2 Temperature range 30 70 C Humidity 95 r h Operation DIN EN 60 721 3 3 Climatic conditions class 3K5 Mecha...

Страница 124: ...GND SHIELD 12VAC1 12VAC2 CANH CANL GND SHIELD AZL5 x FE FE SQM4 LMV52 Brown brn White wh Yellow yl Green grn Black blk Brown brn White wh Yellow yl Green grn Black blk Flue gas temperature PLL52 PLL5...

Отзывы: