unicraft EKZT Series Скачать руководство пользователя страница 11

Operation

EKZT-Series | Version 1.04

11

7.1 Operating conditions

The working area must be dry, fire and explosion pro-
tected and free of any corrosive or poisonous sub-
stances. 
The chain hoist. must not be used to lift or move danger-ous 
goods such as molten, poisonous or radioactive materials.

The electric chain hoist is not intended for outdoor use. If 
outdoor use is required, appropriate roofing of the 
electric chain hoist must be provided.

Operating time: 2m/M5   40%

Working cycle 10 minutes, including 4 minutes of opera

-

tion and 6 minutes of rest.

7.2 Electrical connection

Step 1:    Check if the mains voltage complies with the 

tension indicated on the type plate..

Step 2:   Connect the mains cable to the power supply 

system. 

Step 3:    Press the control bar button and check the 

function of the electric chain hoist. 

Step  4:   If the chain hoist fails to move (phase sequence 

safety device has been activated), switch off 
the safety device and correct the phase se

-

quence.

7.3 Test run

Before using the chain hoist to lift a load, a no-load test 
should be carried out to test all functions.  In particular, 
the function of the raising and lowering limits should be 
tested. 

7.4 Raising a load

Step 1:    Hit the hook of the chain hoist on a suitable an

-

chorage point of the load and check that the 
safety of the hook is closed.

Step 2:    Press the button "OPEN" and initially drive only 

until the load chain is tensioned.

Step 3:    First, lift the load only a short distance and 

check that the chain and load are stable.

Step 4:     Lift the load calmly and evenly upwards.

EKZT-Serie

Temperature range  [°C]

-20 - +40

Humidity

up to max. 85%

Altitude

up to max. 1000 m

Working environment

not flammable, dry and 
dust-free

DANGER!

Danger to life due to electric cur

-

rent!

There is an imminent danger of life in case of con-
tact with life components by electrocution.

-  The chain hoist must only be connected by a quali-

fied electrician.

-  Work on the electrical system may only be carried 

out by qualified electricians.

ATTENTION!

Devices with 400 V / 3-phase connection have a 
phase sequence protection device: If the phase 
sequence is incorrect, the power supply is automati

-

cally interrupted.

NOTE!

-  Do not wind load chain around load.

-  Load chain must not be turned in itself.

-  Check the center of gravity of the attachment point 

to prevent movement and slippage of the load.

-  Slings (eyelet, chain, etc.) must lie loosely in the 

hook base.

-  Hook tip may not be loaded.

-  Close the fuse. 

NOTE!

-  The operator must have sufficient freedom of move

-

ment.

-  The chain hoist must be able to swing freely in the 

pulling direction.

-  Lift and lower limit: When the lift limit is reached, the 

power automatically shuts off and the load hook 
stops immediately.

-  The load hook deforms when overloaded, there is 

no brittle breakage.

Содержание EKZT Series

Страница 1: ...EKZT S ERIES EKZT 5 2 Operating Instructions Electric Chain Hoist EKZT 5 1 EKZT 5 2 EKZT 10 1 EKZT 10 2 EKZT 20 1 EKZT 20 2...

Страница 2: ...Safety 3 2 1 Symbol explanation 3 2 2 Obligations of the operating company 4 2 3 Requirements to staff 5 2 4 Personal protective equipment 5 2 5 General safety regulations 6 2 6 Safety information for...

Страница 3: ...nce and knowledge gained from using the application which then could be shared and be valuable to develop our products even further 1 3 Limitation of liability All information and notes in these opera...

Страница 4: ...r correspond to the current status of the regulations and must adapt these if necessary The operating company must unambiguously reg ulate and determine the responsibilities for instal lation operatio...

Страница 5: ...ur cus tomer service for the execution of all arising work 2 4 Personal protective equipment The personal protective equipment serves to protect per sons against impairments of safety and health while...

Страница 6: ...tenance or repair is complete 2 7 Safety marking on the electric chain hoist The following safety marking is attached to the electric chain hoist fig 1 which must be observed and follo wed Fig 1 Safet...

Страница 7: ...ich prevent any accidents or damage caused by these re si dual risks Risk of crushing of upper and lower limbs while equipment is operating During set up and adjustment works it may be come necessary...

Страница 8: ...s should be ta ken to a collection point for recyclable materials or to the local waste disposal company 5 3 Storage Oil the electric chain hoist and store it in a frost free and dry environment Do no...

Страница 9: ...arrow clockwise 2 Key ON Kettenzug einschalten 3 Position OPEN Lift the load upwards 4 Position AB Lift the load upwards 5 Position LEFT Move landing gear to the left 6 Position RIGHT Move landing ge...

Страница 10: ...always be suspended from suitable equipment which has sufficient load bear ing capacity to withstand the weight of the load and the chain hoist If the load bearing capacity is exceeded the chain hoist...

Страница 11: ...that the safety of the hook is closed Step 2 Press the button OPEN and initially drive only until the load chain is tensioned Step 3 First lift the load only a short distance and check that the chain...

Страница 12: ...to the actual signs of wear If you have questions about maintenance work and intervals contact the manufactu rer The contact details can be found in chapter 1 2 Cu stomer Service If the electric chai...

Страница 13: ...ing the chain check the chain guide and re place if necessary main tenance intervall maintenance work before every use Check the chain hoist for damage and wear especially the chain links for bending...

Страница 14: ...severe condi tions e g frequent operation with full load dusty or ag gressive environment high switching frequency high switch on duration the test distances must be shorte ned Experts for the inspec...

Страница 15: ...cause Solution Chain hoist motor is not functioning 1 Inadequate power supply 2 Wrong phase conductor 3 Switch defective 4 Rectifier defective 5 Transformer defective 6 Motor defective 1 Check power...

Страница 16: ...and year of construction on the type plate which is fi xed on the compressor Example The support hook for the EKZT 5 1 must be ordered The carrying hook has the position number 26 in the spare part dr...

Страница 17: ...2 Spare parts drawing In case of service the following drawing shall help to identify the necessary spare parts If necessary send a copy of the parts drawing with the marked components to your author...

Страница 18: ...al wiring diagram 13 Electrical wiring diagram EKZT 5 1 EKZT 10 1 EKZT 20 1 Fig 9 Electrical wiring diagram EKZT Models with a lifting speed EKZT 5 2 EKZT 10 2 EKZT 20 2 Fig 10 Electrical wiring diagr...

Страница 19: ...es with all relevant provisions of the above mentioned directive as well as the other applied directives below including their applicable modifications at the time of the declaration Relevant EU direc...

Страница 20: ...40 h 200 h when nee ded 200 h when nee ded yearl y bearings gears lubricate unction check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain...

Страница 21: ...when nee ded 200 h when nee ded yearl y bearings gears lubricate function check braking system Cleaning brake disc Check for wear brake disc Replacement brake disc Measurement of wear Chain hook Repl...

Страница 22: ...www unicraft de...