Unicont SPb PS-103-20A Скачать руководство пользователя страница 4

Unicont SPb Ltd 

 

Technical Documentation PS-103-20A 

 Page 

Switching PS-103-20A to the reserve power occurs automatically in case of refusal, de-

energizing and absence of the basic power supply on PS-103- 20A. It is possible to accompany 
transition to emergency supply by an alarm signal. Indication or sound signal can be an alarm 
signal, in this case terminal LS1 could be utilized any way the user likes. 

The alarm signal is adjusted to the absence of an entrance power and realized on 

disconnection of relay LS1 dry contacts (see Figure 1). 

 

5.

 

Device installation 

It is recommended to install the device in the following order: 
1. Choose the place for the device installation to provide an easy cables admission and 

their ends cutting. One of the best places is a vertical wall inside a ship; 

2. Fix strongly PS-103 case on a vertical wall and with an effort of a hand check up the 

security of attachment (for overall dimensions see Figure 2); 

3. Remove the body face; 
4. Route and pass connecting cables from external devices through cable entries, 

disposed on the PS-103 bottom part; 

5. Connect passed cables to the corresponding plugs on board; 
6. Power the device with the switch which is on the left wall of the case. Check the 

correctness of the device connection in consideration of the indicator’s inclusion and 
serviceability of the connected equipment, alarming absence. 

7. To switch input voltage to 110 VAC unplug wire “3” of the transformer T1 from 

PCB’s terminal block and plug wire “2”. Isolate open part of the wire “3”. 

 

Содержание PS-103-20A

Страница 1: ...Unicont SPb Ltd Power supply unit PS 103 20A Technical Documentation 103 2 21012011 St Petersburg 2011...

Страница 2: ...ents 1 GENERAL INFORMATION 3 2 DELIVERY SET 3 3 PERFORMANCE SPECIFICATION 3 4 GENERAL FUNCTIONS AND TECHNICAL SPECIFICATION 3 5 DEVICE INSTALLATION 4 6 SERVICE 7 7 TRANSPORT AND STORAGE 7 8 WARRANTY 8...

Страница 3: ...c isolation output power supply from a power line 4 General functions and technical specification PS 103 20A executed in the metal case with fastening for installation on vertical wall inside a ship O...

Страница 4: ...ce installation to provide an easy cables admission and their ends cutting One of the best places is a vertical wall inside a ship 2 Fix strongly PS 103 case on a vertical wall and with an effort of a...

Страница 5: ...Unicont SPb Ltd Technical Documentation PS 103 20A Page 5 Figure 1 PS 103 20A Electric Diagram...

Страница 6: ...gress of moisture in order to avoid damages to the applied decals do not use organic solvents while cleaning the device surface Prohibited device exposure to the impacts to the connected cables tensio...

Страница 7: ...s with the help of measuring devices 3 Other servicing is reduced to the operating rules observance storage and transportation observance Servicing needs to be realized at least once a year 7 Transpor...

Страница 8: ...e condition or has a damaged body and other causes beyond the manufacturer s control 4 If self made electrical devices were used 5 If there was an attempt to repair the unit by a person who is not an...

Страница 9: ...umber was manufactured and accepted in accordance with the regulatory requirements of the state standards and applicable technical documentation and is suitable for operation Quality control represent...

Отзывы: