Service info

ting request. If at the same time

there is a request for domestic hot

water the lamp switches off.

Burner ON lamp (Green) (F)

When this  lamp is illuminated it

indicates that the burner is on,

both for central heating or for do-

mestic hot water production.

Burner lockout  warning lamp

(G)

The function of this lamp is to si-

gnal that the burner’s control is in

lockout position, due to

- lack of gas or

- H.L. thermostat  cut-out due to an

over-heating of the boiler (95°)

In the first case, if the burner does

not fire, it will be necessary to

verify if the gas gate valve is

open.

In the second case due to a lack

of circulation or to an excessive

scaling  deposit in the heat

exchanger the H.L. thermostat

could shut down the boiler at 95°C.

Reset Button (L)

In the first case, which we pre-

viously described, in order to reli-

ght the boiler it will be necessary

to press the button 

(L)

 using a nail

or something like that.

In the second case, before pres-

sing the button 

(L)

, it will be ne-

cessary to wait for the tempera-

D.H.W. temperature control

(C) + No Frost (Only for IVEN

RTN / RTFS when combined

with an external D.H.W. tank)

If the knob is set within the

range indicated by the arrow

on the illustration it means is

possibile to adjust the D.H.W.

temperature from a minimum

of 25°C to a maximum of

57°C.

The reference to the knob in

the position points out that the

boiler's sanitary circuit is not

in operation (in that case the-

re is no production D.H.W.). If

in the mean time the B  knob

is in the position        the anti-

freeze protection of an exter-

nal D.H.W. tank is activated.

Note: for IVEN RTN/RTFS

when a D.H.W. storage tank

is not fitted, the knob (C)

must be positioned and

must stay onto the

symbol

Power ON lamp (Green) (D)

When this  lamp is illumina-

ted it indicates that the boiler

is connected to the mains sup-

ply.

CH request  lamp (Green) (E)

If this  lamp is illuminated it

indicates that there is a hea-

ture of the H.L. thermostat 95°C

to drop at least of 25 K.

Chimney-sweeper push button

(H)

This button allows the starting of

chimney-sweepers function, that

is to say that the boiler works at

maximum power (or at minimum

power) in order to allow adjust-

ment’s operations and combu-

stion's tests.

By pushing one time the button,

the boiler works at maximum ou-

tput. (              )

By pushing the button while the

boiler works at maximum output,

the boiler will work at minimum ou-

tput. (                 )

To go back to the boiler normal

operation switch OFF and ON the

boiler via the A switch.

3.2

SWITCHING

ON / OFF

For the operation of the boiler in the 

WINTER

mode the knob 

''B''

 reference must be posi-

tioned within the range indicated by the arrow

on the figure shown above.  The limit of the

arrow corresponds to the minimum and maxi-

mum temperature values of 45°C and 78°C.

SWITCHING ON

D.H.W. temperature adjust-

ment range for the models:

IVEN 04 CTN/CTFS

D.H.W. temperature adjust-

ment range for the models:

IVEN 04 RTN/RTFS

when conbined with an

external D.H.W. tank.

C

C

B

B

Note: If a room thermostat is fitted, set it to

the desired temperature.

SWITCHING OFF

Switch off the boiler by acting on the switch

''A''

.

For the operation the boiler in 

SUMMER

 mode,

only for domestic hot water production, the

knob 

''B''

 reference has to be positioned on

the SUN        and the D.H.W. temperature

value has to be adjusted using the knob 

''C''

.

Shut off the gas cock upstream the

boiler in case a prolonged inactivi-

ty period of the same is expected.

Содержание IVEN 04 RTN 24

Страница 1: ...00331967 1a edition 02 2004 IVEN 04 RTN 24 RTFS 24 RTFS 28 CTN 24 F CTFS 24 F CTFS 28 F INSTALLATION USE AND MAINTENANCE...

Страница 2: ...irs to the boiler Non observance of the above requirement may jeopardize the safety of the boilers and expose people animals and property to danger To guarantee efficiency and correct functioning of t...

Страница 3: ...inal Output 10 Pcond Condensing Nominal Output only for condensing boiler 11 D Specific flow rate EN 625 12 Qn Nominal heat input 13 Qnw Nominal heat input for D H W system if there are different out...

Страница 4: ...boilers pag 14 2 2 8 Smoke evacuation 80 air suction flange pag 15 2 2 9 Discharge of flue gas into coaxial ducts with a diameter of 100 60 mm Type A accessories pag 16 2 2 10 Flue gas discharge and a...

Страница 5: ...modulation Minimum output control Electronic control of ignition ramp Anti freeze function Pump anti jamming function Pump over run function High limit thermostat 95 C Three speed circulating pump Exp...

Страница 6: ...Circulating pump 18 D H W flow restrictor 10 12 l min 19 Flow switch 20 Cold water filter 21 By pass M C H system flow C D H W outlet G Gas inlet F D C W inlet R C H system return 1 Heating circuit sa...

Страница 7: ...c air vent 15 Circulating pump 16 Filling valve except French Belgium and England version 17 By pass M C H system flow G Gas inlet R C H system return 1 Heating circuit safety valve 2 Low water level...

Страница 8: ...87 43 87 32 2 93 2 86 8 1 76 3 19 87 7 17 5 17 6 60 86 2 65 7 9 163 2 13 2 6 8 0 256 1 4 OPERATING DATA Nominal output Minimum output Actual water efficiency at full load 100 Min required water effici...

Страница 9: ...s conduits and fittings must only be carried out by a registered service provider The system must be cleaned and serviced once a year This includes an inspection 900 495 390 Keep the packaging materia...

Страница 10: ...g the boiler above applian ces which might affect operation when in use cookers which produce greasy ste am washing machines etc avoid installing natural draught boilers in corrosive or very dusty atm...

Страница 11: ...FLUE GAS DISCHARGE SYSTEM NATURAL DRAUGHT OPEN FLUE BOILERS Connection to the chimney A good chimney is very important for the cor rect functioning of the boiler it must therefore conform with the fol...

Страница 12: ...ill be fixed must protrude from the wall of the building for a length of at least twice the diameter of the duct the draught terminal must overlap the con nection to the boiler by at least 1 5 m see f...

Страница 13: ...including two ducts one for the suction of com bustion air and the other for the exhaust of the combustion products through coaxial or dual ducts The chimney must comply with rele vant applicable law...

Страница 14: ...of the building I 300 From the ground or from another floor L 2500 Between two vertical terminals M 1500 Between two horizontal terminals N 1000 From a facing front surface without opening or teminals...

Страница 15: ...e pipe of 80 mm dia is 20 m for IVEN 04 RTFS 24 e IVEN 04 CTFS 24 F and 25 m for IVEN 04 RTFS 24 e IVEN 04 CTFS 28 F included a wide radium curve and one smoke terminal For this type of installation t...

Страница 16: ...ust be reduced by 1 metre The diaphragm 44 supplied with the boi ler must be inserted in the flue gas exhaust pipe as shown in figure 13 for installa tions with horizontal coaxial pipe up to 1 m and w...

Страница 17: ...pe see fig 16 WARNING In case the flue duct has to cross walls or floors or if it is easily reachable it is ne cessary to foresee a convenient insulation of such a duct The flue duct during the operat...

Страница 18: ...CARICO CHE DI ASPIRAZIO NE 80 DIMENSIONS FOR CONNECTINGTHE AIR INTAKE ANDTHE FLUE GAS DISCHARGE WITH DUAL DUCTS Example N 1 fig 18 Primary air suction from perimeter wall and flue gas discharge on roo...

Страница 19: ...ng measurements must be made the combustion air temperature measured in hole 2 see fig 20 the flue gas temperature and CO2 mea sured in hole 1 see fig 20 Make these measurements with the boiler runnin...

Страница 20: ...ust be connected to the relevant connections of the boiler M and R see fig 7 When determining the size of the heating cir cuit pipes it is essential to bear in mind the pressure losses induced by radi...

Страница 21: ...0 0 8 0 6 0 4 0 2 0 0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 V1 V2 V3 6 2 6 0 5 8 5 6 5 4 5 2 5 0 4 8 4 6 4 4 4 2 4 0 3 8 3 6 3 4 3 2 3 0 2...

Страница 22: ...nce to the upper holes C and fix the panel If the boiler is already installed go on with the emptying of the boiler Relate for the discharge connection of the safety valve a plastic pipe with hose ada...

Страница 23: ...he female faston of the earth wire must be introduced in the male faston GND1 Connection of the ON OFF room thermo stat RT Approach the connectorY1 Remove the existing jumper and connect on its place...

Страница 24: ...DULATING VALVE V2 SS FL SR DK 5 4 3 2 1 4 3 2 1 A3 COM NA TL TF TL A4 3 2 1 4 3 2 1 4 N L NC NA C V PV A5 5 4 3 2 1 5 4 3 2 1 RTN24 CTN24F RTF 24 RTF 28 CTFS 24 F CTFS 28 F Y1 6 A2 SS 5 4 3 2 1 6 IG A...

Страница 25: ...an 0 8 1bar if this value is lower use the water filling tap on the boiler to adjust the pres sure This must be performed when the system is cold Use the temperature and pressure gau ge on the boiler...

Страница 26: ...weeper switch H fig 35 on the panel board in this way the boiler will operate at maximum output when the burner is ignited check that the MAXIMUM pressure value corresponds to that indicated on the ta...

Страница 27: ...gas valve see table INJECTORS PRESSU RES and adjust the pressure of the bur ner as indicated in section ADJUSTING THE BURNER check that the burner is functioning pro perly check that there are no gas...

Страница 28: ...ner as previously shown in fig 30 switch on the boi ler in heating mode and proceed as follows Wait about 50 sec to allow the burner pres sure to reach the standard operating va lue Check the pressure...

Страница 29: ...is in short circuit with earth d The input at the minimum rate is not enough e The PCB does not detected the flame a The chimney draught is not correct b The H L thermostat has cut in An over heating...

Страница 30: ...the thermostatic val ves are closed or the system gate valves are closed b The circulation pump is blocked or is faulty a The boiler may be frozen 2 10 7 b The D H W sensor is faulty 2 10 6 c One or...

Страница 31: ...ION priority 4 Description False flame has been detected at ignition start up 2 10 5 CH TEMPERATURE SENSOR priority 3 Description CH sensor interruption or short circuit 2 10 6 DHW TEMPERATURE SENSOR...

Страница 32: ...it means that the boiler always gives priority to the production of domestic hot water if it is requested and controls the temperature of the water of the heating circuit from a minimum of 45 C to a m...

Страница 33: ...TFS when a D H W storage tank is not fitted the knob C must be positioned and must stay onto the symbol Power ON lamp Green D When this lamp is illumina ted it indicates that the boiler is connected t...

Страница 34: ...ly put in lockout position and the red warning lamp G lights In this case proceed as follows Ascertain that the gas cock is open and that there is gas in the gas pipe try to ignite a gas cooker If so...

Страница 35: ...35...

Страница 36: ...of transcript or press Also reserves the right to bring those changes that it will hold necessary to it own products or profits without jeopardizing its essential characteristics AG S P A 46033 castel...

Отзывы: