21
ENGLISH
Installation Instructions
!Dea aB 24
- make sure that all the connections are watertight.
- after commissioning the boiler (see par. 3.10) and
bringing the system to the operating temperature,
stop the boiler and repeat the air bleed operations.
- let the system cool down and, if necessary, return
the water pressure to 0.8/1 bar.
(See par. 4.4).
Содержание !DEA AC 23
Страница 10: ...10 DEA AB 24 Vista dall alto Vista da sotto ...
Страница 46: ...10 DEA AB 24 View from above View from below ...
Страница 74: ...38 ...
Страница 75: ......