12
Instruction for the installer
3.3 - PACKAGING
The
ALKON
range of boilers are supplied fully assembled in a
strong cardboard box.
After having unpacked the boiler check that it is
intact and undamaged.
Keep the packaging material (cardboard box,
plastic bags, polyester protection etc
.) out of
the reach of children as they can be
dangerous.
UNICAL
refuses all liability for injury to persons, animals or
damage to property deriving from not having respected the
above mentioned recommendations.
In the packaging, in addition to the boiler, you can also find the
following contents:
-
Service logbook
-
User’s instruction guide
-
This installation and servicing manual
-
Warranty
-
Nr. 2 spare parts request coupons
-
N° 2 wall plugs for fixing the boiler to the wall
-
Pipe kit
-
Wall mounting template
Note:
DO NOT DISPOSE OF PACKAGING IN THE
ENVIRONMENT
The
ALKON
boiler
is a thermal unit designed for use with the
family gas category
II
2H3P
.
The appliance must be installed in compliance to the
instructions contained in this manual.
The installation must be carried out by a competent qualified
engineer,
whom will assume the responsibility of complying
to all the local and/or national regulations published in
the official publications, as well as all the applicable codes
of practice.
The installation must be carried in accordance to the codes of
practice, the regulations and the requirements hereby indicated,
which constitute an indicative list, but not a complete one, as
these continue to undergo developments.
National installation regulations:
Gas plants for domestic use fed by network distribution
Standard UNI-CIG 7129
Gas plants for domestic use not fed by network distribution
Standard UNI-CIG 7131
Law dated 5.03.90 n°46
Law dated 9.01.91 n°10
Other applicable statutory requirements:
Law 1083/71 (ref. Standard UNI for the design, installation and
maintenance).
Law 46/90 and D.P.R. 447/91
Law 10/91 and D.P.R. 412/93 and subsequent amendments
D.M 1.12.1975
Moreover, the boiler must be installed in accordance to all the
regulations regarding the boiler room, and comply to the
building regulations and the prescriptions regarding central
heating plants in force in the country the boiler is installed.
The appliance must be installed, commissioned and serviced
according to the regulations in force. This is also valid for the
hydraulic system, the flue outlet system and the boiler location
room.
3.2 – STANDARD CODES FOR INSTALLATION
18
24 - 28
35
A
435
484
535
B
794
844
844
C
414
414
414
ALKON
Содержание ALKON R 24
Страница 47: ......