The Airbor 2 requires clean, dry lubricated air at a
maximum pressure of 6.2 bar (620kPa/90 psi) .
The air supply should always be turned off and
disconnected before installing or removing any accessory
on this machine.
Connect the chosen coolant delivery system to the arbor.
To commence drilling, place the machine in the correct
drilling postion. To activate the magnet, extend the
telescopic magnet handle for more leverage, and pull it to
the left.
Re-check the unit is correctly positioned for the hole to be
cut, and close the magnet handle extension.
To start the motor, disengage the motor lever locking pin by
pulling the handle on motor actuating lever, then move the
handle to the left. The motor will start.
While the motor is running, the magnet cannot be
disengaged.
When the cut is complete, stop the motor by moving the
lever to the right
O
perating
i
nstructiOns
Содержание Airbor 2
Страница 6: ......