background image

P/N:110401103773

Содержание UT312

Страница 1: ...P N 110401103773 ...

Страница 2: ...CONTENTS I Introduction to UT312 Product 1 II Unpacking Inspection 2 III Safety Notices 2 IV Instrument Structure 3 V Instrument Setup and Operation 4 VI Technical Indicators 6 VII Maintenance 7 ...

Страница 3: ...is an ideal tally instrument I INTRODUCTION TO UT312 PRODUCT Please unpack and check if following items are deficient or damaged or not Please contact the nearest sales service agent of our company if there is any deficiency or damage 1 Host 1set 2 Sensor with magnetic base 1 standard pcs assembled to host 3 Signal wire of sensor 1 standard wire assembled to host 4 Hanging rope 1 standard wire ass...

Страница 4: ...se pay attention to protect LCD of vibration meter to avoid scratch or crush 1 Instrument structure shown in Figure 1 and Form 1 1 Signal wire of sensor 2 Sensor 3 LCD 4 Three gear toggle switch 5 Shell 6 Measurement key signal wire of sensor sensor LCD three gear toggle switch shell measurement key 2 Symbol shown in Figure 2 and Form 2 3 Key instructions shown in Figure 1 The 5 element shown in F...

Страница 5: ... measurement key again Data will be maintained for 1 minute after loosening the key and instrument will power off automatically at the same time Note Please tighten clasp when connecting signal wires and hold instrument and sensor in hands after measurement It is not allowed to hoist sensor by signal wires to avoid influence to service life of such wires LCD display 3 1 2 bit display The maximum d...

Страница 6: ...ignal wires of sensor constantly because instrument may not display due to damage or poor contact of such wires It is not allowed to pull or drag signal wires forcefully Sensor core is closed completely It can not be detached except sensor signals Please clean dirty instrument shell by wet cloth and neutral detergent Please do not use abrasive or solvent Please send damaged vibration meter to fixe...

Страница 7: ......

Отзывы: