ITEM NO.: TV-10A AND TV-10B
REVISED NOV 01, 2018
Printed in Vietnam
THIS ITEM IS PACKED IN TWO CARTONS
- 8 -
STEP 5
Attach doors (N) and (M) to side panels (E) and vertical panels (C) with screws (7) as shown below.
Tighten with a screwdriver.
Insert glass sections (L) into back of doors (M), and lock it as shown below.
STEP 6
Attach drawer sides (P) to drawer front (O) with screws (5) as shown below. Tighten with a screwdriver.
Insert drawer bottom (Q) into the grooves at bottom of drawer sides (P) and drawer front (O) as shown
below.
Attach drawer back (R) to drawer sides (P) with screws (5) as shown below. Tighten with a screwdriver.
Attach support bar (S) to bottom drawer (Q) with screws (5) as shown below. Tighten with a screwdriver.
L
7
A
M
N
B
M
N
O
P
P
Q
5
5
R
S
5
5
5
5