NOTE:
All four corners of each row of panels should be securely fastened to the roof. The corners should already
be secured with the eco-SPARK mounting pads or pipe straps on the plumbing lines connected to the feed
and return lines. The top corner opposite the return corner should already be secured by the panel mounting
hardware.
The above photo (left) shows the return line attached to
the top header and an end cap on the bottom header.
The photo insert (center) the return line connection in
detail.
The above photo (right) shows the feed line attached
to the bottom header and an end cap attached to the
top header.
NOTE:
Be sure to support all of the weight of the plumbing with eco-SPARK mounts or pipe straps. The mounting
hardware is not designed to support the weight of the plumbing in addition to the weight of the collectors.
12. Running the Feed & Return Lines
From Roof to Ground Level.
- Cont.
RUNNING THE FEED & RETURN LINES FROM THE ROOF TO GROUND LEVEL.
-
24
Fig. 12.1
May be either
CPVC or PVC pipe
Must be
CPVC pipe
INSTALLATION MANUAL eco-SPARK™ SOLAR POOL HEATER
©
2015 UMA Solar