17
Step 3
Loosen the jam nuts (3) on the 4 threaded rods (12) on the inner side of walls on
the unit. Then hold the nut assembly (1) from turning with a 9/16” wrench,
while the outer nuts (5) are taken off. (Note: The threaded rod may come off as
well. The threaded rod must be removed anyways.) Make sure you remove the
top 2 nuts/threaded rods first. This will allow the roof to be removed safely.
Save these rods and hardware for Step 14
Step 4
Once the end wall (14) is removed, clean the caulking out of the grooves of both
walls and off the tongues of the roof. Also slide the pallet (7) away from the
unit.