GENERAL INSTALLATION GUIDELINES
(Page 2 of 4)
TOOLS REQUIRED:
UltraPlay supplies only the special wrenches and bits required to fasten the “tamper-resistant” hardware and components. Refer
to the
Tools Required
page for a detailed list. A power post hole digger may facilitate installation in some circumstances.
1. Compare all parts received to the packing list. Notify UltraPlay immediately of any missing parts. We are not responsible for
parts discovered missing over 10 days after receipt of the shipment.
2. Refer to the Use Zone to ensure this structure will
fi
t into your actual site area. Note the Minimum Area Required
measurements to determine clear space required. A minimum of 6’ clearance is required between any obstacles and your
structure. EXCEPT for slide exits, which require a distance X equal to the highest point of sliding surface with a minimum of 6’
and a maximum of 8’ from the edge of the slide (example: A Slide from a 6’ high deck requires 6’ of clear space with resilient
surfacing in front of its exit).
3. Site selection should include considerations of what is a safer and appropriate play area:
• A level and clear site is ideal, free of power lines or electrical equipment.
• Do not install play equipment near any bodies of water.
• If adjacent to a street with traf
fi
c, ensure adequate fencing acts as a barrier to children running into danger.
4. Site layout should include accurate measurement and marking of all footings prior to any installation. Use the dimensions
shown between footings on the Use Zone to plot out the actual footprint of the play structure before doing any digging. Also
locate any free-standing play equipment in the same way, providing the necessary clearance between the equipment as well as
any fences, trees, etc. Ensure at this time you have enough total space for the equipment to be installed.
5. If using Inground footers, excavate holes as shown in the Use Zone using a string line. An optional string line level is very
helpful. If a level and clear site is not possible, adjust the depth of the footings to maintain a minimum depth of 18” for support
posts at the lowest grade. NOTE: If soil conditions are very loose or otherwise unstable, a larger diameter footing may be
required. Inquire with local contractors for appropriate recommendations.
6. Begin your Discovery Centers installation by erecting the decks as shown within the following instructions. Once all decks are
installed, components such as slides, climbers, etc., can be connected per their respective assembly instructions.
7. CPSC guidelines mandate that there shall be no gaps present in the playground equipment that are between 3-1/2” and 9”.