background image

Step 2: System Setup 
Change Override Days (Default 14 Days) 

Press CONFIRM to show menu, scroll to ‘Advanced Settings’ and press CONFIRM. Then scroll 
down to ‘Set Max Days/Rchg’ and press CONFIRM. You can now scroll up and down to change 
the amount of days for the override.  
 

Change Regeneration Time (Default At 2:00am)  

Press CONFIRM to show menu, scroll to ‘Advanced Settings’ and press CONFIRM. Scroll down to 
‘Set Recharge Time’ and press CONFIRM. You can now scroll up and down to change the time 
your request for the regeneration to be performed. 

[email protected] 

01622 933 853 

www.ultra-soft.co.uk 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Содержание Cyan

Страница 1: ...ded some of our water softners that would be suitable for you below SOFT WATER MODERATELY SOFT WATER SLIGHTLY HARD WATER MODERATELY HARD WATER HARD WATER VERY HARD WATER Your Water Softener Recommenda...

Страница 2: ...e placed close to the rising main Take care to allow hard water take off points for a drinking water facility and or an outside tap The distance between the drain and the softener should be as short a...

Страница 3: ...the water softener is tested to a pressure of 6 bar 87psi we recommend the fitting of a pressure limiter should your pressure exceed 4 bar 58 psi The minimum working pressure is 1 5 bar 21 7psi Start...

Страница 4: ...Waste Pipe Installation Connect the waste pipe to the waste outlet on the softener and run the hose to either an up stand or outside drain a minimum air gap of 20mm must exist at the end of the drain...

Страница 5: ...is please follow these instructions Using the up and down buttons scroll to Advanced Settings and Press CONFIRM Scroll down to Set Residual Water and press CONFIRM This will show you the total amount...

Страница 6: ...er has been connected the valve will display the valve model and initialise itself and then display TIME you can then start to program the valve Selections are made using the UP and DOWN buttons until...

Страница 7: ...now scroll up and down to change the amount of days for the override Change Regeneration Time Default At 2 00am Press CONFIRM to show menu scroll to Advanced Settings and press CONFIRM Scroll down to...

Страница 8: ...r plugged D Insufficient water flowing into brine tank E Leak at oring on riser F Internal valve leak G Regeneration cycles not correct H Shortage of resin I Bad quality of feed water or turbine block...

Страница 9: ...e and brine line D Stop water supply and restart program install with safety brine valve in salt tank E Repair or replace safety brine valve Pressure loss or rust in pipe A Iron in water supply pipe B...

Страница 10: ...core or C sealing ring D Reduce water pressure or use pressure relief connector function Salt water going to service A Foreign material in injector or injector fails to work B Brine valve cannot be s...

Отзывы: