
21
www.ultrachefgrills.com
4 x N570-0080 (#14 x 1/2”)
3/8”(10mm)
4 x N570-0080 (#14 x 1/2”) 1 X N430-0002
7. Front Cabinet Support Installation
Fasten top rail assembly to the front of side panels using (4) #14 x 1/2” screws. For ease of installation start all screws
before tightening completely. Snap magnet into place as shown.
3/8”(10mm)
8. Heat Shield Installation
Attach heat shield above propane tank ring using (4) #14 x 1/2» screws. Attach one end under lip of back panel and other
end to underside of front cabinet support.
Содержание 485
Страница 38: ...38 www ultrachefgrills com 485 PARTS DIAGRAM...
Страница 42: ...42 www ultrachefgrills com 485RSB PARTS DIAGRAM...
Страница 46: ...46 www ultrachefgrills com 485RSIB PARTS DIAGRAM...
Страница 47: ...47 www ultrachefgrills com ELECTRICAL CIRCUIT DIAGRAM FOR MODELS WITH INTERNAL LIGHTS ONLY...