![ujk technology 102946 Скачать руководство пользователя страница 5](http://html2.mh-extra.com/html/ujk-technology/102946/102946_manual_3291151005.webp)
5
Assembly Instructions
Continues Over....
14
18
22
15
19
23
16
20
24
13
17
21
O
Manoeuvre the ‘Adjustable Stop’ (O) to the centre
of assembly (F) and lightly tighten the butterfly nut
Insert the Adjustable Stop (O), ‘T’ bolt into
the ‘T’ slot to the end of assmbly (F) and slide on
Locate the four oval nuts you removed earlier
and reattach as illustrated
Line up the oval nuts in the height spacers (J) with the ‘T’ slots
in the guide rails (E) and slide the guide rails on
Locate the four height spacer tubes (J), dismantle and insert
the Phillips screws into the four holes in the base (C)
Introduce the height spacer tubes
down over the four threads as shown
Put to hand three oval nuts (N) and the two threaded knobs (K)
Turn the assembly over and tighten all the fixings
Remove the handles and the two nuts from assembly (H).
Introduce the threads through the holes in assembly (B)
as illustrated and replace the nuts
Holding the assembly (H) in place attach the threaded handles
Insert two oval nuts (N) into the ‘T’ slot to the end of guide
rail (E), see illustration above. Repeat for the remaining oval
nut but to the opposite rail
Lower the clamping beam assembly (B) as shown, down over
the two rails (E) and line up the threaded holes in oval nuts (N)
with the three pre-drilled holes in the beam assembly
J
J
E
N
N
E
K
H
B
O
Threaded handle
Содержание 102946
Страница 3: ...3 Parts Breakdown P A B C D E F G H I J K N O Q R S L M...
Страница 11: ...11 Notes...