UDOR ZETA 70 Series Скачать руководство пользователя страница 1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Es 

 MANUAL DE USO Y MANTENIMIENTO PARA BOMBAS DE MEMBRANA 

 

instrucciones para el montaje

 

En 

USE AND MAINTENANCE MANUAL FOR DIAPHRAGM PUMPS 

assembly instructions

 

EMPRESA CON SISTEMA DE GESTION DE LA 

CALIDAD CERTIFICADO PER DNV 

= ISO 9001:2008 = 

COMPANY WITH QUALITY MANAGEMENT SYSTEM 

CERTIFIED BY DNV 

= ISO 9001:2008 = 

 

 

 

Leer atentamente el presente manual antes de utilizar la bomba, en particular, las
advertencias de seguridad. Conservarlo en lugar adecuado y mantenerlo inalterado. 

 

Please carefully read this manual before using the Pump, in particular follow the safety 
information. Store in a suitable place to keep it unalterate. 

 

 

Содержание ZETA 70 Series

Страница 1: ...IFICADO PER DNV ISO 9001 2008 COMPANY WITH QUALITY MANAGEMENT SYSTEM CERTIFIED BY DNV ISO 9001 2008 Leer atentamente el presente manual antes de utilizar la bomba en particular las advertencias de seg...

Страница 2: ...TO 9 1 MANTENIMIENTO ORDINARIO 9 2 LUBRICACI N 7 8 9 10 INCONVENIENTES CAUSAS Y SOLUCIONES 9 En 1 GENERAL INFORMATIONS 1 1 SAFETY SYMBOLS 1 2 PUMP IDENTIFICATION 1 3 WARRANTY 10 2 INTRODUCTION 11 3 IN...

Страница 3: ...R s lo con autorizaci n de la misma franco almac n UDOR y debe estar completo con todos sus componentes originales y no haber sido manipulado Los productos o componentes reemplazados quedar n en propi...

Страница 4: ...oncentraci n salina como por ejemplo agua de mar En ambientes con atm sfera corrosiva o explosiva En presencia de cualquier l quido no compatible con los materiales de fabricaci n de la Bomba Para bom...

Страница 5: ...os los tubos con presi n deben ser marcados de forma durable con el valor m ximo de la presi n admisible que nunca debe ser inferior a la presi n m xima de funcionamiento de la Bomba indicada en la Pl...

Страница 6: ...17 Para una mayor duraci n de los componentes sujetos a desgaste como v lvulas o membranas se aconseja instalar la Bomba en carga o al mismo nivel que el dep sito de alimentaci n De todas maneras las...

Страница 7: ...ebe ponerse en marcha en presencia de hielo o de temperaturas ambientales muy bajas En caso contrario la Bomba podr a sufrir da os muy graves Para poder poner en funcionamiento la instalaci n es indis...

Страница 8: ...PUESTA EN MARCHA DE LA BOMBA Poner en funcionamiento la Bomba con el circuito de impulsi n a presi n 0 Despu s de aproximadamente cinco minutos en 0 bar PSI llevar la Bomba a presi n y alternar ciclo...

Страница 9: ...aci n de presi n Excesiva espuma en el dep sito de agua o nivel demasiado bajo Restablecer las condiciones ideales en el dep sito de agua El caudal de las toberas es mayor que el de la Bomba a Control...

Страница 10: ...free of charge to the warehouse of UDOR and complete with every single original component without any sign of tampering Replaced products or components pass over to the ownership of UDOR Warranty of a...

Страница 11: ...h high salt content such as seawater for example In workplaces where there is a corrosive or explosive atmosphere In the presence of any liquid that is not compatible with the constructional material...

Страница 12: ...imum working pressure of the Pump written on the Label 6 5 SPEED AND ROTATION DIRECTION The rotation speed of the shaft of the Pump must never exceed the RPM written on the Label of the actual Pump Th...

Страница 13: ...the table on page 17 To safeguard the lifetime of the components subject to wear and tear such as valves and diaphragms the pump should be installed below or at water level UDOR Diaphragm Pumps are i...

Страница 14: ...y damaged To start the system the whole circuit must be completely defrosted 9 MAINTENANCE 9 1 ROUTINE MAINTENANCE If the Pump is used for light duty purposes the following routine maintenance jobs ar...

Страница 15: ...kshaft N while filling to eliminate air pockets Re mount the oil fill cap F or the oil fill plug R 9 INITIAL START UP Start the Pump with the outlet line at 0 pressure after about 5 minutes at 0 press...

Страница 16: ...efill tank Nozzle volume is greater than Pump capacity a Check relief valve adjustment b Reduce nozzle orifice size or number of nozzles used One or more check valves seating improperly Clean or repla...

Страница 17: ...IOTA 20 IOTA 25 0 18 0 40 0 20 0 05 4 9 KAPPA 15 0 10 0 22 0 11 0 03 2 5 5 5 KAPPA 25 KAPPA 32 0 26 0 57 0 29 0 08 8 18 KAPPA 40 KAPPA 50 0 49 1 08 0 55 0 15 11 24 KAPPA 33 KAPPA 43 KAPPA 53 0 56 1 2...

Страница 18: ...18 12 PARES DE APRIETE TORQUE SPECIFICATION...

Страница 19: ...22 40 30 25 18 8 6 10 7 ZETA 170 ZETA 200 30 22 40 30 25 18 34 25 8 6 10 7 ZETA 230 ZETA 260 ZETA 300 30 22 40 30 34 25 8 6 10 7 RO 320 RO 400 30 22 50 37 34 25 10 7 30 22 IOTA 20 IOTA 25 14 10 25 18...

Страница 20: ...DOR S p A Via A Corradini 2 42048 Rubiera Reggio Emilia Italia in the person of its legal representative declares under its sole responsibility that the partly completed machinery of its own productio...

Отзывы: